search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Home » Keywords: » incorrect design

Items Tagged with 'incorrect design'

ARTICLES

The Glitch & The Fix, May 2016 -- Glitch drawing

Supplying two loads for multiple boiler system

The Glitch & The Fix, May 2016
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
May 16, 2016

An installer has piped a multiple boiler system to supply two loads.


Read More
The Glitch and The Fix, April 2016 -- Glitch drawing

Wood-gasification boiler with existing piping

John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
April 11, 2016

An installer plans to replace an outdoor wood-fired furnace with a new cordwood-gasification boiler with a rated output of 150,000 Btu/hr. The outdoor furnace is located about 100 ft. from the indoor mechanical room where the 1-in. PEX insulated underground piping joins the thermal storage tank. The installer plans to use the existing underground piping.


Read More
March 2016 The Glitch and The Fix -- Glitch drawing

Modified primary/secondary hydronic piping system

March 2016 The Glitch and The Fix
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
March 18, 2016

An installer wants to achieve hydraulic separation between three zone circulators. He also wants to have the same supply water temperature to each zone, so he pipes up what he calls a “modified primary/secondary system.”


Read More
February 2016 The Glitch & The Fix -- Glitch drawing

Hydraulic separator piping to indirect water heater, boilers

The Glitch & The Fix, February 2016
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
February 11, 2016

A designer needs to connect an indirect water heater to a multiple boiler system. He selects a hydraulic separator and connects the piping of the indirect water heater on the same side as the boilers.


Read More
The Glitch and The Fix, January 2016 -- Glitch drawing

Retrofit with biomass boiler

The Glitch and The Fix, January 2016
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
January 12, 2016

A heating professional is asked to retrofit a biomass boiler to an existing distribution system consisting of older cast-iron radiators, iron piping and an oil-fired boiler.


Read More

A primary concern in a multiboiler system

December 2015, The Glitch and The Fix
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
December 7, 2015

A multiple boiler system using sectional cast-iron boilers has been configured to supply two loads.


Read More

Radiant floor heat with hydraulic separator needs circulators

The Glitch & The Fix, November 2015
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
November 10, 2015

An installer is asked to provide a relatively simple single-zone, slab-type floor heating system supplied by a geothermal water-to-water heat pump. He’s heard that a hydraulic separator is a good component in such systems.


Read More

Dubious solar hot water drainback

The Glitch & The Fix, October 2015
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
October 14, 2015

An installer uses an unpressurized thermal storage tank for drainback protection of a solar thermal system, and carefully slopes all the collectors and collector array piping for 1/4 in. per ft. drop.


Read More

Radiant floor panels supplied by pellet-fired boiler

April 2015 The Glitch and The Fix
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
April 13, 2015

An installer is asked to use a pellet-fired boiler to supply heat to two zones of low-temperature radiant floor panels. The system includes a three-way motorized mixing valve to reduce the supply water temperature to the distribution circuits.


Read More

First attempt at wall-mounted modulating-condensing boiler

The Glitch and The Fix, March 2015
John Siegenthaler 200x200 author headshot on a white background.
John Siegenthaler, P.E.
March 12, 2015

A heating contractor who’s trying out his first wall-mounted mod/con boiler installs it as shown above. When buying the boiler, the contractor was told to use a pair of closely spaced tees to separate the boiler and distribution system.


Read More
More Articles Tagged with 'incorrect design'
Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Popular Stories

Hot water pipes

Campus shutdown at Oakland University exposes hidden risks of aging hot-water infrastructure

Floor heating manifold cabinet with flowmeter and PEX pipe.

Elegance extended: How to use the homerun system of connecting heat emitters

Industrial pressure gauge on a tank.

From cutting edge to classic: How to modernize outdated pneumatic control systems

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing