search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Radiant & HydronicsThe Glitch & The Fix

Radiant floor panels supplied by pellet-fired boiler

April 2015 The Glitch and The Fix

By John Siegenthaler, P.E.
April 13, 2015

The Glitch

An installer is asked to use a pellet-fired boiler to supply heat to two zones of low-temperature radiant floor panels. He installs the system shown above. It includes a three-way motorized mixing valve to reduce the supply water temperature to the distribution circuits. He carefully sizes the thermal storage tank to 2 gal. of water per 1,000 Btu/hr. of boiler rating and buys a tank with a center bottom connection as shown.

Look over this system and identify at least six errors, omissions or unnecessary hardware.

The Fix

Nearly all pellet-fired boiler use steel fire-tube heat exchangers. As such, they are conventional boilers from the standpoint of needing protection against sustained flue gas condensation. The system shown in the Glitch drawing cannot limit heat transfer between the boiler and the thermal storage tank. Thus, when the water temperature entering the boiler is below approximately 130° F, which may be a high percentage of the boiler’s operating time, flue gases will condense within the boiler.

Eventually, this condensation will probably leak out and form puddles on the floor. However, that’s not the worst of it. If the sustained flue gas condensing is allowed to persist, it will eventually scale and corrode the boiler’s heat exchanger, as well as its vent connector piping and chimney.

The Fix drawing shows one way to prevent sustained flue gas condensation through use of a three-way motorized mixing valve that reacts to the boiler’s inlet water temperature. This valve, which is controlled by the boiler’s electronics, limits heat transfer from the boiler to the tank when necessary to avoid sustained condensing mode operation.

Other errors in the Glitch drawing that have been corrected in the Fix drawing include:

1. A vertical flow jet would be created inside the thermal storage tank due to the bottom center connection. This would mix the water in the tank and destroy temperature stratification (e.g., hottest water at top of tank, coolest water at bottom). Without internal detailing that could prevent vertical flow jets from the bottom center connection, the alternative of connecting to the lower side of the tank is preferred.

2. There’s an extra circulator between the upper right outlet of the tank and the hot water port of the three-way mixing valve for the distribution system. It’s not needed. If present, the “helper circulator” would be in a quasi-series configuration with the two zone circulators. This would induce flow through a zone circuit that is supposed to be off when the other zone circuit is on.

3. The two zone circulators are mounted too close to the supply header. Always allow at least 12 pipe diameters of straight pipe upstream of the inlet of any circulator. This allows turbulence to partially dissipate before the flow stream enters the circulator. The result is a quieter circulator.

4. The zone circulators are shown without internal (or external) spring-loaded check valves. Without these valves, there will be flow reversal through an inactive zone circuit if the other zone circuit is operating.

5. The 3-gal. expansion tank hanging from the underside of the air separator is grossly undersized given the volume and potential temperature cycling range of the thermal storage tank. It’s also poorly positioned relative to the boiler circulator (e.g., that circulator is pumping toward the expansion tank rather than pumping away from it). Use proper sizing calculations for the expansion tank

6. The purging valves on the return side of the zone circuits are upside down.

7. The supply water temperature sensor for the three-way mixing valve is only sensing the temperature on one zone circuit. It needs to be moved to the header upstream of both zone takeoffs.

8. There is no air vent at the top of the thermal storage tank. Without it, air will be trapped above the upper piping connections.

9. There is no check valve to stop reverse thermosiphoning from the thermal storage tank through the boiler when the boiler circulator is off and the boiler cools down. Reverse thermosiphoning would continually dissipate heat from the thermal storage tank under such conditions.

Download a pdf of the April 2015 The Glitch & The Fix.

KEYWORDS: energy efficiency hydronic system design incorrect design radiant system design

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

John siegenthaler 200x200

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2025 Next Gen ALL-STARS hero 1440

    2025 Next Gen All Stars: Top 20 Under 40 Plumbing Professionals

    This year’s group of NextGen All-Stars is full of young...
    Plumbing & Mechanical Engineer
    By: Kristen R. Bayles
  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Popular Stories

Hot water pipes

Campus shutdown at Oakland University exposes hidden risks of aging hot-water infrastructure

Floor heating manifold cabinet with flowmeter and PEX pipe.

Elegance extended: How to use the homerun system of connecting heat emitters

Industrial pressure gauge on a tank.

From cutting edge to classic: How to modernize outdated pneumatic control systems

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Related Articles

  • Radiant floor heating with pellet boiler

    See More
  • John Siegenthaler: Renewable Heating Design

    A new method for heating domestic water in pellet-fired boiler systems

    See More
  • Radiant floor heat with hydraulic separator needs circulators

    See More

Related Products

See More Products
  • 51CHeeKvw4L._SX322_BO1,204,203,200_.jpg

    Hydronic Radiant Heating: A Practical Guide for the Nonengineer Installer

  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

  • quick-basic-hy.gif

    Quick & Basic Hydronic Controls

See More Products

Events

View AllSubmit An Event
  • April 10, 2014

    Workshop: Hydronics for High Efficiency Wood-fired and Pellet-fired Boilers

    Session added to April 9-11 Northeast Biomass Heating Expo.
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing