An installer plans to replace an outdoor wood-fired furnace with a new cordwood-gasification boiler with a rated output of 150,000 Btu/hr. The outdoor furnace is located about 100 ft. from the indoor mechanical room where the 1-in. PEX insulated underground piping joins the thermal storage tank. The installer plans to use the existing underground piping.
An installer wants to achieve hydraulic separation between three zone circulators. He also wants to have the same supply water temperature to each zone, so he pipes up what he calls a “modified primary/secondary system.”
A designer needs to connect an indirect water heater to a multiple boiler system. He selects a hydraulic separator and connects the piping of the indirect water heater on the same side as the boilers.
A heating professional is asked to retrofit a biomass boiler to an existing distribution system consisting of older cast-iron radiators, iron piping and an oil-fired boiler.