This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies
By closing this message or continuing to use our site, you agree to our cookie policy. Learn More
This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • Home
  • Products
  • News
  • Glitch & Fix
  • Hydronics
  • Radiant
    • Radiant Comfort Report
  • Blogs/Columns
    • R&H On The Road
    • John Siegenthaler
    • Dan Holohan
    • Ray Wohlfarth
    • Mark Eatherton: Radiant Know-How
  • Buyers Guide
  • Resources
    • Radiant Comfort Report Digital
    • Rep Locator
    • Industry Calendar
    • Store
    • Market Research
    • eNewsletters
  • Plumbing & Mechanical
Home » Retrofit with biomass boiler
Hydronic TechnologyThe Glitch & The FixRadiant & HydronicsGreen Plumbing and Mechanical

Retrofit with biomass boiler

The Glitch and The Fix, January 2016

The Glitch and The Fix, January 2016 -- Glitch drawing

Glitch drawing: A biomass boiler is to be retrofitted to an existing distribution system consisting of older cast-iron radiators, iron piping and an oil-fired boiler. The system needs to draw heat from a thermal storage tank heated by the biomass boiler, as well as an existing oil-fired boiler. Graphics credit: John Siegenthaler, P.E.

The Glitch and The Fix, January 2016 -- Fix drawing

Fix drawing: The objective of the system is to accept heat from the thermal storage tank and/or the auxiliary boiler, and send that heat to the distribution system. The primary loop and its associated circulator could be eliminated as shown in the Fix drawing above. This would reduce installation cost as well as operating cost over the life of the system. Graphics credit: John Siegenthaler, P.E.

The Glitch and The Fix, January 2016 -- Glitch drawing
The Glitch and The Fix, January 2016 -- Fix drawing
January 12, 2016
John Siegenthaler, P.E.
KEYWORDS energy efficiency / hydronic system design / incorrect design / renewable energy
Reprints
No Comments

The Glitch

A heating professional is asked to retrofit a biomass boiler to an existing distribution system consisting of older cast-iron radiators, iron piping and an oil-fired boiler. The system needs to draw heat from a thermal storage tank heated by the biomass boiler, as well as an existing oil-fired boiler.

The original heating distribution system was designed to use 180° F supply water on a design day, but will now be retrofitted by outdoor reset control. This will allow the distribution system to operate at supply water temperatures as low as 100° on mild days.

A portion of the proposed piping layout is shown above. Can you identify several details that could be improved?

The Fix

Although the piping shown in the Glitch drawing could work, it uses more hardware than necessary and doesn’t place that hardware in optimal locations.

The objective of the system is to accept heat from the thermal storage tank and/or the auxiliary boiler, and send that heat to the distribution system. Although the primary/secondary arrangement could do this, it is not necessary. The primary loop and its associated circulator could be eliminated as shown in the Fix drawing above. This would reduce installation cost as well as operating cost over the life of the system.

Each heat source (e.g., the thermal storage tank and the existing oil-fired boiler) connect to the distribution system using a pair of closely-spaced tees. This provides adequate hydraulic separation of all circulators.

The Fix drawing is shown with the thermal storage tank not contributing heat to the system. Perhaps the tank has been discharged to a low temperature where it can no longer contribute heat to the system. Or perhaps the pellet boiler is off-line for maintenance. In either case, the water temperature returning from the distribution system could be quite low (based on the use of outdoor reset control).

Although the oil-fired boiler in the original system did not operate with sustained flue gas condensation, that possibility now exists. To prevent corrosion damage to the oil-fired boiler and its flue, a high flow-capacity three-way thermostatic mixing valve has been added to the oil-fired boiler. It will ensure that the water temperature entering this boiler is at or above 130° whenever possible.

Other changes include moving the closely spaced tees that connect the thermal storage tank to the system “upstream” of those that connect the oil-fired boiler to the system. This allows the possibility of lower temperature heat being supplied from storage, while the oil-fired boiler operates to boost the water temperature as necessary.

If simultaneous operation of the thermal storage tank circulator and oil-fired boiler is allowed, the designer should also ensure that heat generated by the oil-fired boiler cannot be inadvertently transferred to the thermal storage tank. This is easily done by using a differential temperature controller to monitor the difference between the water temperature returning from the distribution system and the water temperature available from the top of the thermal storage tank.

The latter is only allowed to contribute heat to the system if the tank temperature remains a few degrees above the return temperature from the distribution system.

Other modifications include:

1. Purging valves have been added to each secondary circuit.

2. The dirt separator has been moved to a location upstream of the heat sources. In this position, it is more likely to intercept dirt returning from the old distribution system before it is carried into either heat source or the other components in the reconfigured distribution system.

The original title of this article was “Overlooped” in the January 2016 edition of Plumbing & Mechanical.

Download a pdf of the January 2016 The Glitch and the Fix.
 

pm-subscribe

Recent Articles by John Siegenthaler, P.E.

John Siegenthaler: New in the neighborhood

The Glitch and Fix: Keep the cost down

Single coil solution

John Siegenthaler: Low temperature leverage

John Siegenthaler: Expansion etiquette

Siegenthaler

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, N.Y. His latest textbook “Heating With Renewable Energy,” will be released in January 2016 from Cengage Publishing. It shows how to use modern hydronics technology to create systems supplied by solar thermal, heat pump and biomass heat sources. Additional information is available at www.hydronicpros.com.

Related Articles

Retrofitting with a pellet boiler

Creating an ideal balance-of-system with modern biomass boilers

Biomass boiler cycling

Controlling wood-fueled biomass boiler systems: Part 2

You must login or register in order to post a comment.

Report Abusive Comment

RCR logo

RCR Buyers Guide

Plumbing and Mechanical

Plumbing & Mechanical December 2019

2019 December

Check out the December 2019 edition of Plumbing & Mechanical: 2020 B.I.G. Book, John Siegenthaler on geothermal water-to-water heat pump system design and installation, maximizing efficiency on small-diameter piping projects and much more!
View More Create Account
  • Resources
    • Reprints
    • List Rental
    • Contact Us
    • AEC Store
    • Blogs
    • Radiant & Hydronics
    • Industry Links
    • Market Research
    • Custom Content & Marketing Services
    • Privacy Policy
  • Want More
    • Connect
    • Survey And Sample
  • Plumbing Group
    • PM Engineer
    • Supply House Times
  • Advertise
    • Advertise
    • Plan for 2020!

Copyright ©2019. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing