search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Radiant & HydronicsThe Glitch & The Fix

First attempt at wall-mounted modulating-condensing boiler

The Glitch and The Fix, March 2015

By John Siegenthaler, P.E.
March 12, 2015

The Glitch

A heating contractor who’s trying out his first wall-mounted mod/con boiler installs it as shown above. All flow into the distribution system supplying three radiant panel manifold stations passes through the three-way thermostatic mixing valve. When buying the boiler, the contractor was told to use a pair of closely spaced tees to separate the boiler and distribution system, so he installed some closely spaced tees as shown.

Can you spot at least five things that should be changed in this layout?

The Fix

Although those are closely spaced tees under the boiler, they don’t serve to hydraulically separate the boiler from the distribution system.

Another poor choice is to install a three-way thermostatic mixing valve (or any mixing assembly for that matter) between a mod/con boiler and the distribution system. It makes no sense to operate the boiler at a temperature higher than needed by the distribution system and then mix down the water temperature. This reduces the ability of the mod/con boiler to operate with flue gas condensation and thus reduces efficiency.

Furthermore, if that three-way thermostatic valve has a low Cv — which is typical of valves of 1-in. pipe size or less — it’s going to act as a significant flow restrictor to the distribution system. Low flow leads to wide delta T on the radiant panel circuits and very likely to insufficient heat delivery.

It’s also likely that very low flow rates through the mod/con boiler will lead to operating problems, especially in boilers with low-mass heat exchangers.

A good microbubble air separator needs to be added to the system. For the best performance, install it where the fluid is hottest, near the boiler outlet. This is done using a vertically mounted separator in the (a) Fix drawing or using a hydraulic separator in the (b) Fix drawing. The latter also provides dirt separation.

There should be a minimum of 12 pipe diameters (12D) of straight tubing upstream of any circulator. This is not the case in the Glitch drawing but has been corrected, and noted, in the Fix drawings.

Finally, take a look at how the circuit purging valves are installed on the zone returns in the Glitch drawing. In this orientation, the only thing they will be purging is the return manifold.

Two possible piping configurations that address these issues are shown above.

Download the March 2015 Glitch and The Fix.

KEYWORDS: hydronic system design hydronic systems incorrect design radiant systems

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

John siegenthaler 200x200

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2025 Next Gen ALL-STARS hero 1440

    2025 Next Gen All Stars: Top 20 Under 40 Plumbing Professionals

    This year’s group of NextGen All-Stars is full of young...
    Plumbing & Mechanical Engineer
    By: Kristen R. Bayles
  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Popular Stories

Hot water pipes

Campus shutdown at Oakland University exposes hidden risks of aging hot-water infrastructure

Floor heating manifold cabinet with flowmeter and PEX pipe.

Elegance extended: How to use the homerun system of connecting heat emitters

Industrial pressure gauge on a tank.

From cutting edge to classic: How to modernize outdated pneumatic control systems

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Related Articles

  • At Greenbuild: Condensing Wall-Mounted Boiler

    See More
  • Just Like A Boiler

    See More
  • Wall Warming

    See More

Related Products

See More Products
  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

See More Products

Events

View AllSubmit An Event
  • September 23, 2025

    How to Get Found First and Chosen Fast

    On Demand When a customer needs help, they don’t wait around—they choose the first business they find and hear back from. This webinar will cover how to get noticed online, capture every lead, and win more business without adding extra staff or hours.
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing