I frequently speak at college campuses and trade apprenticeships. Whether it be to future engineers or contractors, my technical talks typically end up covering non-technical content, specifically career development.
A heating designer is asked to create a three zone radiant floor heating system using a 5-ton (60,000 Btu/h) geothermal heat pump as the primary heat source, and a mod/con boiler as the auxiliary heat source.