A homeowner hires a heating contractor to upgrade his propane-fired cast-iron boiler to a mod/con boiler. The cast-iron boiler is only 15 years old and in good shape.
A multiple boiler system using sectional cast-iron boilers has been configured to supply two loads as shown below. A “crossover pipe” is installed in case the flow rate in the primary circuit is different from the flow through the boilers. There are several piping errors in this proposed design. Can you spot at least five of them?
A heating designer is asked to create a three zone radiant floor heating system using a 5-ton (60,000 Btu/h) geothermal heat pump as the primary heat source, and a mod/con boiler as the auxiliary heat source.