Overview: An installer has decided to use a mod/con boiler with a high head loss characteristic and connects it to the rest of the system as a secondary circuit with its own circulator. The two load circuits require the same water temperature, so he connects them as shown.
The following system has been planned with three 200,000 Btu/hr. boilers with plenty of capacity supplying a primary loop that serves several secondary loops.