The award is presented every two years to a nominee with attributes including technical mastery and a passion for hydronic technologies, demonstrated leadership as an educator and mentor, and an aptitude for cultivating fundraising opportunities for industry causes.
In 1986, I installed a 1.5-ton geothermal heat pump in my home using two 500-foot horizontal HDPE earth loops. After digging a trench, I connected the loops to the pump and opted for a 2 HP swimming pool pump to fill and flush the system, as a garden hose couldn't provide the needed flow rate.
A project needs medium- and low-temperature radiant floor panels. The installer proposes using a mod/con boiler with a 1-inch tempering valve for lower temperatures and plans to pipe the entire system with 1-inch tubing. What potential issues could arise from this design?
The second edition of the Radiant & Hydronics All Stars eBook
October 21, 2024
This second edition of the Radiant & Hydronics All Stars eBook showcases the latest technology and design trends in the radiant and hydronic markets. It features insights from our All Star Roundtable on low-temperature systems and upcoming efficiency standards for circulator pumps by 2028, along with design trends for residential and commercial applications.
In 2024, the North American air-to-water heat pump market saw significant expansion, with nine new offerings introduced at the January AHR show by companies new to this category. By year's end, at least 18 companies either have or plan to offer these pumps in the U.S. Read the list of these companies as of mid-2024.
The two photos below were from the same project. Flow is upward through the vertical pipe in Figure 1. Without any more details being described, can you spot at least two problems in each photo?
Air-to-water heat pumps are becoming popular in the hydronic heating industry due to their energy efficiency and sustainability. Chris Decato of U.S. Boiler Co. notes a rising demand driven by their cost-effectiveness and reduced carbon footprint.
Last fall, we assessed a boiler replacement project for a town hall. Three out of four existing rare condensing cast iron boilers were inoperable within two years, and seven out of eight boilers failed within 10 years. During our visit, we meticulously examined various aspects to identify any potential issues.