The eight-story, 130,000-square foot Silverleaf Hall includes 55 units under contract with NYS Supportive Housing Program for formerly homeless families and 63 affordable units available to single adults and families earning less than 80% AMI.
Upon completion in 2026, the project will create the first fully electrified SRO supportive housing property in New York City.
August 19, 2025
Goddard Riverside, Rockabill Consulting, the archetectural team of IMC Architecture and Magnusson Architecture and Planning and Notias Construction are working together on this project.
A few weeks back, I received a call from an acquaintance named Jack, whom I hadn't talked to in a while. He mentioned a job opportunity and mentioned the radiators in the house have burst. We discussed the details and arranged for me to visit the location.
An emergency call led a team to a school with a leaking boiler, which was shut down due to safety concerns. After clarifying the need for urgent repairs, the executive director approved the work. Complications arose from snow and transport challenges, but a friend connected them with a group of young workers willing to help, easing manpower concerns.
We tackled issues at a 1953 apartment complex with a failing steam system, repairing pumps and leaks. This year, we discovered significant deterioration in the 6-inch steel steam main while preparing for its replacement, highlighting the poor condition of the aging infrastructure.
A hotel’s aging hot water system faces upgrades as leaking tanks are set to be replaced with smaller units. While a full redesign is desired for efficiency, budget constraints may limit the project scope, causing temporary hot water disruptions.
Joseph Cariola, a licensed plumber and operations manager at Feddon Mechanical, converted his garage into an in-law suite with a bedroom and bathroom to accommodate up to three people.