search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Kristen R. Bayles: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • BIG BOOK DIRECTORY
    • REP LOCATOR
    • INDUSTRY CALENDAR
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Plumbing & Mechanical Engineer

Case Study: Veritus Heat Pump Water Heater in New York Retrofit

A high-rise residential building in Battery Park, Manhattan replaces an aging gas-fired DHW system with a high-efficiency air source heat pump — achieving Local Law 97 compliance and significant energy savings.

By Plumbing & Mechanical Editorial Staff
A view of a Manhattan apartment building.
Image courtesy of Lochinvar.
August 17, 2026


Project 212 Warren St. - High-rise residential building
Location Battery Park, Manhattan, NYC
Lochinvar Products Installed  1 - Veritus Air Source Heat Pump Water Heater
Plumbing Contractor  Leardon Boiler Works 
MEP Engineer Bazini Engineering
Owner's Representative Alternative Sustainability
Manufacturers' Representative  Wallace Eannace, In. 

The Challenge 

The owner of a high-rise multi-family residential building in Battery Park, Manhattan faced a pressing infrastructure decision: replace an aging, gas-fired domestic hot water (DHW) system that could no longer deliver reliable, efficient service to residents.

The upgrade needed to prioritize energy savings and meaningfully reduce the carbon footprint — a requirement driven by New York City’s Local Law 97, part of the 2019 Climate Mobilization Act. Buildings over 25,000 sq ft that fail to significantly reduce greenhouse gas (GHG) emissions face a per-ton carbon penalty.

Retrofitting a Manhattan high-rise with commercial heat pump water heating technology is no simple feat. Space constraints within the building and rooftop mechanical room along with the difficulty of rigging large equipment into an existing building presented serious obstacles. Hiring a crane for this project was cost prohibitive.

Several Lochinvar Veritus heat pump water heaters.Image courtesy of Lochinvar.

An Innovative Installation Approach

The idea of using the building’s general exhaust air for the heat pump’s air supply was the result of some creative thinking from John Stevens with Alternative Sustainability and Wallace Eannace, Inc. That air supply was ducted into the unused space in the penthouse mechanical room. Once the approach was established, finding the right piece of equipment was key.

The Veritus was selected for a few key reasons:

  • Its size enabled it to fit in the freight elevator and be rigged up the narrow stairs leading to the penthouse mechanical room. 
  • The selected Veritus model matched the base load of the zone, and its source airflow closely matched the available building exhaust airflow.
  • The Veritus uses R-513A refrigerant, which is non-toxic and non-flammable, making it safe for indoor installation.
  • The Veritus has a double wall heat exchanger that allows for direct heating of the potable water; eliminating the need for glycol.

The Lochinvar Veritus was placed in a previously unused section of the mechanical room. A wall, ductwork and louvers were installed, and this section of the mechanical room was converted into a dedicated plenum room. Three nearby exhaust fans were ducted into this plenum room, positively pressurizing the space.

When the Veritus unit operates, building exhaust air provides 100% of the air supply. Any excess air exits freely through an outside air louver, which always remains open. The unit’s discharge air is ducted to the exterior to prevent recirculation.

By reclaiming heat from the building’s exhaust air, the Veritus unit operates with maximum efficiency. John Stevens worked with building management to confirm existing fan airflow, determine electrical modifications, and provide the necessary ductwork.

 Exterior duct work (from the fan discharge view). This air was previously discharging to the atmosphere and it’s now recovered.Image courtesy of Lochinvar.

System Performance

The building had existing domestic water storage tanks, that the Veritus heat pump feeds to supply DHW. Three new Lochinvar electric water heaters were added as backup capacity for periods of peak demand. 

The water flows from the storage tanks into the electric water heaters. When the heat pump is meeting the demand, the electric water heaters remain off or in stand-by mode and act as additional storage. If the temperature in the system drops below set point, the stand-by electric water heaters energize to satisfy the requirement. 

Addressing NYC’s Unique Challenges

Electricity costs in New York City run approximately 50% above the U.S. average — one of the highest rates in the nation. In this environment, a heat pump’s coefficient of performance (COP) is a critical economic metric. The Veritus HPWH’s CoP of up to 4.61 means it delivers up to 4.61 units of heat energy for every unit of electrical energy consumed — making decarbonization financially viable even at NYC electricity rates.

Despite the particularly harsh winter conditions New York City experiences, the unit performs exceptionally well. During the last week of January 2026, with exterior temperatures reaching as low as 9°F (-12.7°C), the temperature inside the heat pump room remained at 65°F (18°C) — a testament to the effectiveness of the building energy recovery / plenum room design.

“The Veritus meets the base load of the DHW. In typical day-to-day operations, the backup electric water heaters rarely turn on — that’s how well the Veritus unit has been performing. We have yet to find another unit that operates as efficiently while simultaneously offering incredible installation benefits.” John Stevens, CEO, Alternative Sustainability

KEYWORDS: case study heat pump water heater (HPWH) retrofit sustainability

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2025 Next Gen ALL-STARS hero 1440

    2025 Next Gen All Stars: Top 20 Under 40 Plumbing Professionals

    This year’s group of NextGen All-Stars is full of young...
    Plumbing & Mechanical Engineer
    By: Kristen R. Bayles
  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
Manage My Account
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HyperPure® PE-RT tubing
    Sponsored byLegend

    Why Sustainable Innovation Will Shape the Future of Plastic Pipe

  • HyperPure® PE-RT tubing
    Sponsored byLegend

    More Than One Right Answer: Rethinking PE-RT in Modern Plumbing Systems

Popular Stories

An aerial view of the Obama Presidential Center.

Plumbing Contractor Cites $3.9M in Losses Tied to Obama Presidential Center Project

hydronics systems

Improving Hydronic Efficiency

The Pentair logo.

Pentair to Acquire Taco

Download the FREE 2025 Water Conservation, Quality & Safety eBook

Events

August 4, 2026

Is Contractor Training a Cost Center or Your Most Overlooked Growth Engine?

In this webinar, you’ll learn how to reframe training as a measurable revenue driver by connecting contractor performance improvements to real business outcomes—like increased equipment sales, stronger margins, and greater share-of-wallet.

August 25, 2026

Every Minute Matters: A Plumber’s Guide to Growth Without Adding

Join this webinar for practical strategies to grow revenue, improve profitability, and create more capacity using the resources you already have.

View All Submit An Event

Poll

Getting your new hire jobsite-ready

How long does it typically take to get a new hire jobsite-ready?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Related Articles

  • A technician installs an A. O. Smith Votrex 120V Heat Pump Water Heater.

    Case Study: A. O. Smith Voltex 120V Heat Pump Water Heater in California apartment complex

    See More
  • The Lochinvar 208V Veritus Air Source heat pump water heater.

    Lochinvar 208V Veritus Air Source heat pump water heater

    See More
  • 09 PM 0923 Products Lochinvar

    Lochinvar announces new commercial heat pump water heater

    See More
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing