REHAU’s EVERLOC+ R-20 manifold connectors for hydronic applications support leak-free reliability in a one-piece assembly including an EVERLOC+ insert with a pre-installed O-ring and swivel nut.
Ever since the RPA was formed, members have taken advantage of the great benefits the alliance has to offer, such as codes and standards advocacy, a job center network, obtaining and creating valuable education, the annual Radiant Flooring Guide, newsletter subscription, discounts for IAPMO products and services, access to webinars and more. RPA members are professionals from all facets of the radiant profession, including manufacturers, installers, engineers, architects, students, apprentices and inspectors.
The very first installation of the Mikrofill 3 hydronic pressurization unit in North America took place recently in a mechanical room of an assisted- and independent-living community in Southwest-suburban Chicago. You might say the flower of this innovation grew from the soil of an old industry friendship.
Are you an ace troubleshooter? We pose a question to you, our readers, to review a system’s schematic layout and discover its faults, flaws and defects.
Many hydronic installers look for ways to differentiate their work, to craft a specific look — maybe even a “brand” — that resonates with customers. For Fernando Lobo, owner of Fairfield, Connecticut-based 1 Call Services, that unique look begins with the raw material list he builds when sizing a boiler replacement, or new boiler install.
A recent inquiry involved a heating system for a school in which two electric boilers were being added to supplement the output of a gas-fired cast-iron boiler, and take advantage of low “off-peak” electrical rates.
Given the current prices for fuel oil and propane, and current state and federal incentive programs, many homeowners are asking heating contractors to replace their aging boilers with a geothermal heat pump system.