search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Radiant & HydronicsThe Glitch & The Fix

Wood-gasification boilers are born to burn

The Glitch and The Fix, September 2014

By John Siegenthaler, P.E.
September 15, 2014

The Glitch

Due to the high price of fuel oil, a contractor is hired by a building owner to install a wood-gasification boiler to supplement the oil boiler. The building’s distribution system consists of a three-zoned air handler with hot water coils. The owner tells the contractor that even the existing system doesn’t evenly heat all the zones. The contractor installs the boiler as shown, but doesn’t make any changes in the distribution system.

Can you spot several details the spell trouble ahead or that should be changed to provide better heat distribution?

The Fix

Wood-gasification boilers are not like oil- and gas-fired boilers. You can’t just turn them on and off several times an hour. Once started, they are designed to completely burn a firebox full of dry wood at the highest possible combustion rate. In most cases this means heat is being produced much faster than the building requires it.

The answer is thermal storage. Don’t even think about using a wood-gasification boiler without adequate thermal storage.

The Fix figure above shows one way to reconfigure this system.

The system now includes thermal storage, the size of which needs to be calculated based on the capacity of the boiler and the allowable temperature change in the tank. A typical residential-scale wood-gasification boiler will usually require 300 to 500 gal. of storage.

Other details in the Fix drawing include boiler inlet water temperature protection. This is necessary, even in systems with distribution systems that may operate at 140° F or higher supply water temperature under design load conditions. The reason is the potential for cool water in the storage tank at times.

The large mass of this cool water could cause the wood-fired boiler, or the oil-fired boiler, to operate with sustained flue gas condensation. The wood-gasification boiler is protected by a three-way motorized mixing valve operated by a spring return actuator. Upon a power failure, the actuator fully closes the bypass port of the valve. This allows a piping pathway, driven by thermosiphoning, to carry residual heat from the boiler to the storage tank.

The oil-fired boiler also connects to the storage tank, but only to the top 20% to 25% of its volume. This provides some buffering mass between the oil-fired boiler and zoned distribution system, but without heating the entire volume of the tank. Temperature stratification will limit the “active” thermal mass of the tank when the oil-fired boiler is providing heat. The oil-fired boiler also has been configured with a three-way thermostatic mixing valve to ensure its inlet water temperature is high enough to prevent sustained flue gas condensation.

Other corrections/details include a variable-speed, pressure-regulated circulator to provide differential pressure control of the distribution system as various zones turn on and off.

Each air handler branch now has a balancing valve.

A microbubble air separator has been added to the distribution system at the point of highest temperature and lowest pressure.

The size of the expansion tank has been increased, in this case using three smaller tanks in parallel, to accommodate the much higher water volume in the system. This also could be handled using a single floor-mounted tank with sufficient volume. As an estimate, plan on an expansion tank volume that’s about 10% that of the storage tank volume.

Download a pdf of the September 2014 Glitch and Fix here.

KEYWORDS: hydronic system design incorrect design schematic layout

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

John siegenthaler 200x200

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2025 Next Gen ALL-STARS hero 1440

    2025 Next Gen All Stars: Top 20 Under 40 Plumbing Professionals

    This year’s group of NextGen All-Stars is full of young...
    Plumbing & Mechanical Contractor
    By: Kristen R. Bayles
  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Popular Stories

Hot water pipes

Campus shutdown at Oakland University exposes hidden risks of aging hot-water infrastructure

Floor heating manifold cabinet with flowmeter and PEX pipe.

Elegance extended: How to use the homerun system of connecting heat emitters

Industrial pressure gauge on a tank.

From cutting edge to classic: How to modernize outdated pneumatic control systems

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Related Articles

  • T and ∆T pumping when it comes to wood-gasification boilers

    See More
  • The Glitch and The Fix, April 2016 -- Glitch drawing

    Wood-gasification boiler with existing piping

    See More
  • Using wood-gasification boiler for space heating and repurposed thermal storage tank

    See More

Related Products

See More Products
  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

  • Lessons Learned: Connecting New Boilers to Old Pipes

  • Inspector Book.jpg

    Lessons Learned: A Guide to Boilers for Home Inspectors

See More Products

Events

View AllSubmit An Event
  • April 10, 2014

    Workshop: Hydronics for High Efficiency Wood-fired and Pellet-fired Boilers

    Session added to April 9-11 Northeast Biomass Heating Expo.
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing