search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Radiant & HydronicsThe Glitch & The Fix

Trimming a hydronic heating system with panel radiators

December 2013 The Glitch & The Fix

By John Siegenthaler, P.E.
December 2013 Glitch drawing

December 2013 Glitch drawing: A hydronic system is to supply four panel radiators, each with its own thermostatic radiator valve, and an indirect water heater from a gas-fired sectional cast-iron boiler. The system is designed using primary/secondary piping as shown above.

December 2013 Fix drawing

December 2013 Fix drawing: The drawing above shows an improved design that provides the same functionality and eliminates one of the circulators required in the previous approach.

December 2013 Glitch drawing
December 2013 Fix drawing
December 30, 2013

The Glitch

A hydronic system is to supply four panel radiators, each with its own thermostatic radiator valve, and an indirect water heater from a gas-fired sectional cast-iron boiler. The system is designed using primary/secondary piping as shown above.

The primary circulator operates whenever the space-heating load or the indirect water heater call for heat. All circulators are standard, fixed-speed, wet-rotor units.

Can you spot at least five details that are incorrect?

Beyond the incorrect details, are there ways to improve the design to provide the same functionality with few components?

The Fix

Before looking at improvement, here’s a tally of the errors on the primary/secondary approach:

1. The primary circulator is pumping toward, rather than away from, the point of no pressure change (e.g., where the expansion tank connects to the system).

2. The secondary circulators are both pumping toward, rather than away from, the primary loop. This is incorrect because each secondary circuit “sees” the primary loop connection as its point of no pressure change (because the expansion tank is in the primary loop). Thus, all secondary circulators should pump into their respective secondary circuits.

3. The heat exchanger coil within the indirect water heater is not piped for counterflow. The hot water should always enter the top connection of the coil.

4. Assuming primary/secondary piping was used, the indirect tank should be the first load connected to the primary loop, and thus able to operate with the highest available water temperature.

5. The purging valve is missing on the return side of the secondary circuit serving the indirect water heater.

6. There is no thermal trap installed on the thermostatic tempering valve of the indirect tank. This will lead to thermosiphoning and wasted energy.

7. There is no means of differential pressure control within the zoned secondary circuit serving the panel radiators.

8. The lack of check valves in the secondary circulators will allow for heat migration. As shown, the indirect water heater will use its secondary circuit piping to continually dump heat to its surroundings.

The Fix drawing (above) shows what I consider to be an improved design that provides the same functionality and eliminates one of the circulators required in the previous approach.

First, the loads do not require this to be a primary/secondary system. The low-head-loss boiler and generously sized header piping provide sufficient hydraulic separation between the two circulators, even when one of the loads operates with a variable-speed circulator. Just keep the headers relatively short and sized for a maximum flow velocity of 2 ft. per second. This approach eliminates both the installation and operating cost of a primary circulator.

Another change is the use of a pressured regulated constant ?P circulator within the subsystem serving the panel radiators. This eliminates the need of a differential-pressure bypass valve and significantly reduces operating cost compared to a fixed-speed circulator. 

Today, it’s likely to be less expensive to install a pressure-regulated circulator compared to a fixed-speed circulator paired up with a differential-pressure bypass valve. The operating cost also will be less than half that of an equivalent fixed-speed circulator.

A thermal trap is shown on the piping leading to the thermostatic mixing valve on the indirect water heater.

Because of the very low hydraulic resistance of the boiler and headers, it is possible to locate the system’s expansion tank on the inlet of the boiler where its temperature will remain a bit cooler. Thus, its internal air pressure will be less effected by the elevated water temperature in the system.

Download a pdf of the December 2013 The Glitch & The Fix.

KEYWORDS: hydronic system design incorrect design

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Siegenthaler

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

Rovanco fire.jpg

Fire breaks out at Rovanco Piping Systems' Joliet manufacturing facility

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

Close-up of a man holding a blue helmet. Construction worker with office and people in background. Close-up of a construction worker's hand holding a working helmet.

Enhancing workplace safety through challenges

PMCE Home-X April 29 Free Webinar: From Legacy to Leadership: Preparing Your Home Services Business for the Next Generation

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

May 15, 2025

From Legacy to Leadership: Preparing Your Home Services Business for the Next Generation

Whether you're passing the torch to a family member or grooming current employees for leadership, preparing the next generation of leaders is key.

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Glitch drawing: Piping a mod/con boiler for a hydronic/radiant heating system

    Trimming the fat in baseboard-floor heating-domestic hot water system

    See More
  • Image of square cast iron woodburner on top of granite slab with orange fire flames burning.

    Combining a wood-fired boiler with a hydronic distribution system

    See More
  • November 2013 Glitch drawing

    Controlling boilers in a hydronic system

    See More

Related Products

See More Products
  • howcome.gif

    How Come? Hydronic heating questions we've been asking for 100 years (with straight answers!)

  • 51CHeeKvw4L._SX322_BO1,204,203,200_.jpg

    Hydronic Radiant Heating: A Practical Guide for the Nonengineer Installer

  • Residential_Hydronic_Heatin.gif

    Residential Hydronic Heating Systems Course

See More Products

Events

View AllSubmit An Event
  • April 10, 2014

    Workshop: Hydronics for High Efficiency Wood-fired and Pellet-fired Boilers

    Session added to April 9-11 Northeast Biomass Heating Expo.
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing