Due to the high price of fuel oil, a contractor is hired by a building owner to install a wood-gasification boiler to supplement the oil boiler. The building’s distribution system consists of a three-zoned air handler with hot water coils.
The standard will allow authorities to recommend certification as a minimum requirement to obtain a business license to practice hydronic heating and cooling within that jurisdiction.