An installer is asked to use a pellet-fired boiler to supply heat to two zones of low-temperature radiant floor panels. The system includes a three-way motorized mixing valve to reduce the supply water temperature to the distribution circuits.
Home-building surveys indicate that energy efficiency is among the most-wanted features of home buyers and that builders are responding to this demand.
Taco’s popular FloPro factory training program will resume this year, with the first class on April 30 to May 1 to take place at Taco’s Innovation & Development Center in Cranston, R.I.