The 2015 Plumbing-Heating-Cooling Contractors — National Association’s Legislative Conference in Washington, April 22-23, saw more than 100 contractors, trade press and association executives.
An installer is asked to use a pellet-fired boiler to supply heat to two zones of low-temperature radiant floor panels. The system includes a three-way motorized mixing valve to reduce the supply water temperature to the distribution circuits.