search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Kristen R. Bayles: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • BIG BOOK DIRECTORY
    • REP LOCATOR
    • INDUSTRY CALENDAR
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Plumbing & Mechanical Engineer Radiant & HydronicsThe Glitch & The FixGeothermal | Solar Thermal

Swapping out aging boiler with geothermal heat pump

November 2014 The Glitch & The Fix

By John Siegenthaler, P.E.
November 12, 2014

The Glitch

Given the current prices for fuel oil and propane, it’s not surprising that some installers would view a geothermal heat pump as a replacement for an aging boiler. An installer who is used to boiler replacements may view the mechanical room aspects of changing from a boiler to a geothermal heat pump the same as a boiler changeout; just swapping out one “box” for another. Unfortunately, this can lead to some significant operating problems.

Use your knowledge of heat pump operating characteristics and basic hydronics to identify at least five design errors in the Glitch schematic above.

The Fix

The vast majority of geothermal water-to-water heat pumps are single speed “on/off” devices. When on, they produce heat output at or near their rated output, depending on the exact entering temperatures and flow rates on both sides of the heat pump. Very little thermal mass is available in a heat pump to store any heat that’s produced but not immediately sent to the load.

The distribution system shown is zoned with valves; thus, flow rates and rates of heat delivery can change drastically as the zones turn on and off. This will almost surely cause “out of range” operating conditions within the refrigeration circuit of the heat pump, leading to internal safety switch trips (or worse).

To stabilize the situation, it’s imperative to include a well-insulated buffer tank between the heat pump and the zoned distribution system as shown in the Fix drawing. The heat pump cycles on and off based on the setpoint temperature of the buffer tank and the temperature differential across which the tank needs to operate. The load circuits can now operate completely independently of the on/off cycling of the heat pump.

It’s also imperative that the heat emitters are compatible with the water temperatures available from the heat pump. I suggest that the entire distribution system should be designed (or in this case redesigned) so that it can deliver design heat output with a supply water temperature no higher than 120° F. In the Fix drawing, this is represented by a change to low-temperature baseboard piped in parallel.

Other means of increasing the surface area of the heat emitters, and thus decreasing the required water temperature, are certainly possible.

Other errors in the original design include:

• The lack of air separation on both sides of the heat pump.
• The lack of an expansion tank on both sides of the heat pump.
• Lack of differential pressure control on a zoned distribution system.
• Failure to provide counter flow through the evaporator (earth loop) side of the heat pump.
• Failure to route the coolest water (leaving heat pump evaporator) through the upper portion of the horizontal earth loop.

Details that correct these conditions are shown in the Fix drawing above.

Download a pdf of the November 2014 The Glitch & The Fix.

KEYWORDS: geothermal systems hydronic distribution system hydronic system design hydronic systems

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

John siegenthaler 200x200

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2025 Next Gen ALL-STARS hero 1440

    2025 Next Gen All Stars: Top 20 Under 40 Plumbing Professionals

    This year’s group of NextGen All-Stars is full of young...
    Plumbing & Mechanical Engineer
    By: Kristen R. Bayles
  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
Manage My Account
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • HyperPure® PE-RT tubing
    Sponsored byLegend

    More Than One Right Answer: Rethinking PE-RT in Modern Plumbing Systems

Popular Stories

An infographic with "Water Heater Shipment Data" over a chart.

AHRI Data Shows Water Heater Shipments Remain Soft in 2026

Two firefighters in front of a firetruck.

From Firehouse to Jobsite: A Contractor's Approach to Water Heater Replacement

As utilities and building owners look for new energy storage solutions, hydronic thermal storage presents an efficient alternative to batteries in many applications.

An Open & Shut Case (Part 1)

Download the FREE 2025 Water Conservation, Quality & Safety eBook

Events

August 4, 2026

Is Contractor Training a Cost Center or Your Most Overlooked Growth Engine?

In this webinar, you’ll learn how to reframe training as a measurable revenue driver by connecting contractor performance improvements to real business outcomes—like increased equipment sales, stronger margins, and greater share-of-wallet.

View All Submit An Event

Poll

Getting your new hire jobsite-ready

How long does it typically take to get a new hire jobsite-ready?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Related Articles

  • Products AHR Expo Preview WaterFurnace 7 Series with OptiDry

    WaterFurnace announces 7 Series with OptiDry geothermal heat pump

    See More
  • The geothermal heat pump is just like a boiler

    See More
  • Geothermal Heat Pump, Mod/Con Boiler For Radiant Floor Heating

    See More

Related Products

See More Products
  • 51EpbH0yOwL__SL210_.jpg

    We Got Steam Heat!

  • PM0916_Products_Ray-Wohlfarth.png

    Lessons Learned: Brewing with Steam

  • cengagebook.jpg

    Heating with Renewable Energy

See More Products

Events

View AllSubmit An Event
  • May 29, 2014

    Coffee with Caleffi and John Siegenthaler: Air Source and Water Source Heat Pump Systems.

    Coffee with Caleffi will be hosted by John Siegenthaler on May 29, 2014.
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing