• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Plumbing & Mechanical Engineer John Seigenthaler: Renewable Heating Design

Distribution Piping Options for Commercial Radiant Floor Heating

By John Siegenthaler, P.E.
December 4, 2003

Although hydronic radiant floor heating can be incorporated into many types of buildings, it's often a "perfect match" for garage-type buildings with bare concrete slab-on-grade floors. Some examples include vehicle maintenance buildings, aircraft hangers and fire stations.

For starters, the concrete slab is already part of such buildings. Making it into a radiant heat emitter is simply a matter of adding underside insulation and tubing. This keeps the cost per square foot to a minimum. Secondly, in a well-planned system, the tubing is well protected from damage under the concrete. Another plus is that bare slabs operate at relatively low water temperatures. This allows heat sources such as condensing boilers and geothermal heat pumps to attain high efficiency. It also allows for compact distribution piping, as will be discussed shortly. Finally, since people don't walk around barefooted in such facilities, designers can allow more variation in floor surface temperature and thus reduce cost through wider tube spacing.


Long Distance Travel

Larger buildings often require manifold stations to be located far away from the mechanical room. One-way distances of 200 or more feet are not uncommon. Given the expanse of such systems, designers should carefully consider the options available to transport the heat generated in the mechanical room out to the various manifold stations. Design requirements such as zoning different parts of the building, supplying different water temperatures to different manifolds, and providing for constant circulation also have to be worked into the design of the distribution system.

The latter feature--constant circulation--is often desirable for heated slab floors in garage-type facilities. It allows redistribution of heat from interior slab areas to typical "cold sinks" such as the floor area just inside large overhead doors, or the wet floor under a vehicle shedding melted snow and ice. In combination with the huge thermal mass of a large floor slab, constant circulation also provides excellent protection against perimeter freeze-up in the event the heat source is inoperable.

Figure 1 depicts one design option for a system that supplies three independently controlled zones, all operating at the same supply water temperature. The system is supplied by a conventional gas- or oil-fired boiler. Mixing is done in the mechanical room. Water at the mixed supply temperature is then piped to each manifold station using separate zone circulators.


With this approach, the flow rate to each manifold station is based on the design temperature drop of the manifold station. A typical range for this temperature drop is 15 to 25°F.

For example, assume the designer needs to provide 250,000 Btu/hr to a large manifold station where the supply water temperature is 110°F and the blended temperature from the return manifold is 90°F. The temperature drop is thus 110 - 90 = 20°F. The flow rate needed to supply this rate of heat transport at a 20°F temperature drop can be found using Equation 1.

This flow rate requires a minimum tube size of 1.5 inches to keep flow velocity in the range of four feet per second. A 2-inch tube might also be considered based on head loss requirements.

Although it's certainly possible to use 2-inch copper tubing between the mechanical room and a remote manifold station, this is not an inexpensive solution. The choice of distribution tube size also affects the volume of the system, and thus the size of the expansion tank, as well as the quantity of any antifreeze that may be added.

If the mixing device used in this system operates on outdoor reset control, and if properly set, there should be flow through the tube circuits most of the time. However, if a thermostat is turned down several degrees Fahrenheit for a night setback, the zone circulator will stop, as will the flow through the tubing circuits. During a long, cold night, water in tubing located just inside a large overhead door could freeze under such conditions, even though plenty of heat remains within the interior portions of the slab. The freeze protection benefit of constant circulation is not achieved.


Thermodynamic Opportunities

If the heat source supplying the heated slab is a boiler capable of operating in the temperature range of 160 to 200°F, a tremendous opportunity exists for designers who recognize and take advantage of basic thermodynamics. The opportunity at hand is transporting high temperature water to a given manifold station, performing the mixing at the manifold station, and then returning relatively cool water back to the mechanical room. The underlying thermodynamics are simple: The flow rate between the mechanical room and manifold station is inversely proportional to the temperature drop between the supply and return piping. Thus, if the supply temperature to the manifold station was 190°F, and the return temperature from the manifold station was 90°F, the flow rate required to transfer the previously assumed 250,000 Btu/hr can be found using Equation 2.


Because the temperature drop is now five times greater than in the previous example, the required flow is only 1/5 of the previous value. Incidentally, the 5-gallon per minute flow rate required with the 100°F temperature drop could be easily handled by a 3/4-inch tube set between the mechanical room and manifold station.

This approach is known as a "minitube" distribution system. An example of a three-zone mini-tube system is shown in Figure 2.

Notice that flow of hot water to each manifold station is regulated by a variable speed injection pump. This allows each manifold to operate with a different supply water temperature if necessary. It also allows for constant circulation within the manifold circuits.

In a typical minitube system, the distribution circulators at the manifold stations would be turned on when the outdoor temperature drops below a preset value where heating is deemed necessary. They would remain on during the heating season, even during periods where no heat is being supplied to the manifold. Constant circulation at the manifold also maintains accurate feedback from each supply temperature sensor to its associated injection mixing controller.

The primary loop in this system is split into three parallel crossovers. These allow the same water temperature to be available to each injection pump. The closely spaced tees in each crossover are the beginning and ending points for each minitube circuit, and eliminate any flow interference between the injection pumps. The balancing valves in each crossover allow the flow rate in each to be proportioned to the loads served by each manifold station.


Minitube distribution systems can also use two-way modulating valves as their flow control elements. An example of this approach is shown in Figure 3. Notice that a differential pressure bypass valve is used to maintain a relatively constant differential pressure across the injection piping as the control valves modulate. This is necessary to maintain consistent performance. Another possibility is a variable speed pump between the boiler plant and the modulating valves--configured to provide constant differential pressure.

A balancing valve is installed in the return injection riser from each manifold station. When the hot water flow is controlled by a variable speed injection pump, this valve is set so the injection pump will operate at full speed under design load conditions. When injection flow is regulated by the two-way modulating valve, the balancing valve is set so the modulating valve is fully open at design load. These adjustments ensure maximum rangeability of the control system, and thus precise control of supply water temperature.

Minitube systems inherently improve the rangeability of variable speed injection mixing systems. When variable speed injection mixing is done using short injection risers, a throttling valve must be installed in the return riser to remove a significant portion of the pump head. This is necessary to force the circulator to operate at full speed under design load conditions, and thus utilize the full range of speed control. In a minitube system, the vast majority of the head loss occurs due to fluid being carried through the minitube piping.

Since the manifold station circulator is not responsible for flow between the mechanical room and manifold station, it may be possible to use a smaller circulator. This reduces both initial cost and life cycle operating cost.


  • The small minitube distribution piping also loses less heat to surrounding air than would larger diameter distribution piping of equivalent heat transport capacity. However, the supply minitube piping should always be insulated to minimize heat loss.


Reverse-Return Parallel Primary Loop

Another possible piping approach is shown in Figure 4. It combines a two-pipe reverse return primary loop with injection mixing. The two-pipe system would typically travel overhead around the perimeter of the building. A crossover bridge would be installed above each manifold station. A balancing valve is installed in each crossover to prevent overflow. A closely spaced set of tees within the crossover would connect the injection risers to the manifold station below. Either variable speed injection or two-way modulating valves could be used as the injection flow control device. The tube size of the mains could again be relatively small if designed to operate at a high temperature drop.

This design trades off more primary loop piping for short injection risers. Since the latter piping is usually smaller and less expensive, the primary loop routing should be carefully selected to minimize footage of larger diameter tubing and fittings.

Summary

Although traditional two-pipe distribution systems are still a possibility for larger radiant floor heating installations, the piping designs discussed can leverage the high temperature difference between a conventional boiler and a low temperature radiant panel to significantly lower cost, boost system performance and add control versatility. Keep these designs in mind when that next large radiant floor heating system project comes your way.
KEYWORDS: radiant floor heating

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Siegenthaler

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

NIBCO Press Solutions

NIBCO Press Solutions

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

Plumbing equpment parts and wrench on the white background close up.

Plumbing & Mechanical 2025 Plumbing Tools Survey

Latin American plumber fixing a toilet in the bathroom.

Troubleshooting common airflow plumbing issues

Empty modern room with large windows looking out onto a green lawn and trees.

Transitions: What do I do about cooling? (Part 1)

PM BEMIS June 25 Free Webinar: Optimizing Plumbing Solutions for Single-Family, Multi-Family & Public Spaces

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • windhager

    Part 2: Piping options for multiple thermal storage tanks

    See More
  • John Siegenthaler: Renewable Heating Design

    John Siegenthaler: Piping options for multiple thermal storage tanks

    See More
  • May 2015 Glitch image 1

    Piping for radiant panel heating

    See More

Related Products

See More Products
  • M:\General Shared\__AEC Store Katie Z\AEC Store\Images\Plumbing\new sites\pumping-away.gif

    Pumping Away and other really cool piping options for hydronic systems

  • MHH4-cover-image-301x400.jpg

    Modern Hydronic Heating and Cooling For Residential and Light Commercial Buildings, 4th Edition

  • 51CHeeKvw4L._SX322_BO1,204,203,200_.jpg

    Hydronic Radiant Heating: A Practical Guide for the Nonengineer Installer

See More Products
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!