• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Columns

Dan Holohan: What I learned about steam traps

Lessons learned in the field.

By Dan Holohan
Steam Traps
October 22, 2020

Most of this, I had to learn the hard way. Perhaps you’ve done the same, but in case you haven’t, please allow me to save you some heartache. All of this is the absolute truth. 

 

If a float & thermostatic trap is the same size as the pipe it’s on, it’s the wrong size. 

I was once in a 35-story building looking at an F&T trap in the basement. It was at the bottom of a 6-inch main that went up to the top floor. The proper size for that trap would have been 1 1/4 inches. I know this because I checked the trap manufacturer’s catalog. The trap that was there was much larger, and that’s why it had failed. 

An oversized F&T trap barely has to open to dump the little bit of condensate it has to handle. Since this trap was serving only the supply riser, the only condensate it was going to see was the condensate that formed when about 350 feet of 6-inch steel pipe went from ambient temperature to about 215° F. Trust me, that’s not much condensate. And once the riser is hot, there’s hardly any condensate falling back down. That riser is well-insulated. 

When you oversize an F&T trap, it’s barely going to open to handle the condensate it will see. The trap’s pin will ride too close to the trap’s seat, and that leads to metal erosion of both the pin and the seat as the condensate screams by the barely open exit hole. 

So in the case of steam heating, know that in every single case when you see an F&T trap and it’s the size of the pipe it serves, it is oversized. Someone paid too much, and that oversized trap will fail. 

 

All traps need Delta-P 

Without a difference in pressure, a steam trap will just sit there like a metal meatloaf. You need Delta-P to get the condensate to move through the trap. That’s why you’ll usually see traps mounted several feet below steam-to-water heat exchangers. When the exchanger’s control valve shuts, there’s no steam pressure to move the condensate out of the heat exchanger. A vacuum breaker on the shell will open (and please make sure one is there) to let air into the shell. Then the static weight of the water between the outlet of the heat exchanger and the inlet of the steam trap will provide the pressure needed to move the condensate through the trap. It’s all about Delta-P.

 

Beware of backpressure 

Keep your eyes on the outlet side of that trap as well. Does the condensate have to go uphill from there? If so, there will be a check valve and backpressure. You’ll need to consider this when sizing the trap. Also, look at what else is connected to the outlet side of the trap. Are there other steam traps? At what pressure are they discharging? Are they working properly? Are they putting flash steam into the return line? That will also create backpressure. Open your eyes and look around.

 

If you double-trap a return line, the condensate will barely move 

Here again, think about Delta-P. Steam traps trap steam. If you double-trap a return line, there will be no pressure after the first trap to push condensate through the second trap. Remember, where there is no difference in pressure there can be no flow. So the condensate lays in the pipe and blocks the air that’s trying to vent. There’s no heat because if the air can’t get out, the steam can’t get in. Oh, and the boiler will probably go off on low-water because the condensate isn’t returning. The automatic feeder will open to replace the water that’s not returning, and when the steaming cycle is over and the condensate finally does return, the boiler will flood. Or the feed pump’s receiver will overflow. And all because of the double traps.

 

Traps don’t vent air

Air moves through a trap and into the return line, but from there, it has to have a way to get out of the system or the steam won’t go where you need it to go. If the discharge of the trap goes upward, that’s going to form a water seal. Air won’t vent through a water seal (think about a sink trap). And again, where there is air, steam will not go. Think like air when you’re troubleshooting. Ask yourself, “If I were air, could I get out?” Follow the path of the air and look for the vents. If you don’t see them, that’s why the building isn’t heating well.

 

Don’t use bucket traps near a pressure-reducing valve 

To get a bucket trap to work, you have to first prime it with water. When a pressure-reducing valve lowers the pressure of the steam, you wind up with superheat. That’s steam that is hotter than it ought to be for the pressure it is at. Those extra Btu need to go somewhere, and they will gladly go into that bucket trap’s prime water and cause it to turn to steam and leave the trap. Without the prime, the trap will blow steam into the return lines. Not good, and this is why you’ll usually see thermodisc-type traps near PRV stations. 

 

Don’t trap lines that go to gravity wet returns 

A gravity-return system is one that doesn’t have a condensate pump or a boiler-feed pump. If you have, say, a steam unit heater, its return line will need a big main vent to get the air out of the unit heater. That vent should be on the outlet side of the unit heater. But if the condensate is draining into a wet return, just let it fall by gravity into that line. There’s no need for a trap here because all the pipes below the boiler’s waterline are permanently under water. If you use a trap, it will cause condensate to back up into the unit heater. Also not good. 

 

Some traps let condensate flash back to steam 

Particularly F&T traps because they don’t sense the temperature of the condensate. They dump condensate at saturated-steam temperature. That means some of the condensate will flash back into steam when it enters the return line. That causes backpressure, which can affect the operation of other traps. If the trap is near a vented boiler-feed-pump’s receiver, that flash steam will show up as puffs of steam coming out of the vent. That’s liable to cause some knucklehead to put a cap on the vent line. Lower the steam pressure to get rid of the flash steam. Most steam heating systems are running at pressures that are too high anyways, so try lowering it. 

 

Radiator traps last about 10 years

In a typical year, a radiator trap will cycle about 175,000 times. That’s why, after about 10 years, they’re ready to retire. If the trap fails closed, there will be no heat and someone will notice. But if the trap fails open, that radiator will continue to heat and that person won’t complain. The steam, however, will now be in the return lines, causing backpressure on the other traps. Those people will complain because if the air can’t get out of their radiators, the steam can’t get in. And air won’t go into a return line that has steam pressure in it. Ten years is what you get from a trap. If no one has ever looked at them, that’s probably where you’ll find the solution to the heating problem. 

 

Master traps make no sense  

When traps go bad, some installers think they can solve all the problems by piping one enormous trap right at the inlet to the boiler-feed pump. They liken this spot to the trunk of a tree. They don’t understand why all those traps are out there on the tree branches. They don’t realize radiator traps set up the points of pressure and no-pressure throughout the system. 

In this way, they’re similar to balancing valves in a hot-water system. These installers think the dead men who first piped all those traps were stupid. Why would they have used so many traps when they could have gotten by with just one humungous trap down there in the basement? It seems so simple to them.  

These installers are world-class idiots. 

KEYWORDS: contractors hydronics steam traps

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Holohan

Dan Holohan and his wife, Marianne, founded www.heatinghelp.com in 1997. You can reach Dan Holohan at dan@heatinghelp.com. He loves hearing from you!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

NIBCO Press Solutions

NIBCO Press Solutions

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

Watts Nexa mobile image

Behind the Wall: Where smart plumbing gets smarter

Six tankless water heaters that feed the nutraceutical manufacturer’s operations.

How to deliver large volumes of hot water quickly and intermittently

PMCE Home-X April 29 Free Webinar: From Legacy to Leadership: Preparing Your Home Services Business for the Next Generation

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Dan Holohan

    Dan Holohan: How vacuum can cause steam problems

    See More
  • Holohan

    Dan Holohan: What’s the right heat exchanger pressure?

    See More
  • City

    Dan Holohan: The geography of auto-feeders on steam

    See More

Events

View AllSubmit An Event
  • October 9, 2024

    Speed to Lead Accelerators: 3 Ways to Automate Lead Nurturing

    On Demand In this training, we'll be talking about 3 ways to quickly improve your speed to lead metric and make sure that you're booking every job opportunity possible this fall!
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!