search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
  • MEDIA
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Home » Topics » New Product Stories

New Product Stories
New Product Stories RSS Feed RSS

Disposer Flange

April 1, 2008
The Push-N-Seal II from Jomar International is a disposer flange with strainer that improves and replaces the original Push-N-Seal.
Read More

Solar Panel/Tank

April 1, 2008
The Stiebel Eltron indirect domestic hot water storage tank with one or two heat exchangers.
Read More

Commercial Products

April 1, 2008
A sampling of new products from the commercial plumbing market.
Read More

IPS Corp. Shock-Buster™ Hammer Arresters

March 18, 2008
IPS Corp. has added the Shock-Buster™ Hammer Arresters to its product line. They are “AA” size for use in residential and light commercial applications.
Read More

Vessel Bowl Filler

March 1, 2008
The Brookhaven collection from Portuguese faucet designer Cifial features the L-Spout Vessel Bowl Filler.
Read More

Flood Protection

March 1, 2008
Prevent basement flooding and messy floors with General Pipe Cleaner’s Flood-Guard®.
Read More

Boiler Inspection Software

March 1, 2008
Safety inspection software manufacturer Insparisk offers Versentia™, software for the safety inspection industry including boilers, fire protection systems, HVAC equipment and electrical panels.
Read More

Gas Connection Kits [no photo]

March 1, 2008
Dormont Mfg. offers a tankless water heater water and gas connection kit to provide all the components needed to easily and economically install gas or electric tankless water heaters.
Read More

Press-Fitting Valves

March 1, 2008
Cimberio’s CimPRESS line offers a wide range of press-fitting valves for a number of different applications.
Read More

DWV Testing System

March 1, 2008
Tru Enterprises Inc. presents its IAPMO-approved Tru Top Tst tee with a preinstalled, removable testing device.
Read More
Previous 1 2 … 165 166 167 168 169 170 171 172 173 … 326 327 Next
Manage My Account
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

More Videos

Popular Stories

Plumbing pipes in kitchen renovation.

New pipe sizing standard brings critical changes and innovation to building services

Air Conditioning Condenser Unit Mounted on a Concrete Slab outside of a Suburban Brick Home in Tennessee.

What’s it capable of? (part 1)

Details of central heating system in a boiler room.

Bewitched Btus: Understanding the hydraulic consequences of improper primary loop design

Download the FREE 2025 Water Conservation, Quality & Safety eBook

Poll

Getting your new hire jobsite-ready

How long does it typically take to get a new hire jobsite-ready?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products
eBook | 2025 Radiant & Hydronics All Stars

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing