• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
ColumnsPlumbing & Mechanical Engineer John Siegenthaler: Hydronics WorkshopGeothermal | Solar Thermal

Low-temperature opportunities for duel-fuel systems

In situations like this, it makes sense to prioritize use of the lower-cost energy wherever possible.

By John Siegenthaler, P.E.
.
December correction Kudos to PM reader Mike Mills of Design Air in Milwaukee for a close look at Figure 1 in the December 2014 Hydronics Workshop column. He noticed there was no expansion tank shown on the water side of the system. Such a tank is definitely needed. Hereâ??s a corrected drawing.
.
Figure 1.
.
Figure 2.
.
.
.
February 20, 2015

In the December 2014 Hydronics Workshop column, we discussed the benefits of dual-fuel systems that combine a geothermal water-to-water heat pump with a mod/con boiler. The boiler can be configured to provide supplemental heat when the heat pump can’t quite keep up with the load. This allows the heat pump to be sized for 50% to 75% of design load and still provide the majority of the total seasonal heating energy requirement. In “mission critical” applications, the boiler could be sized to provide full design load output if the heat pump was not operating. The latter also is helpful if you need to supply high DHW loads.

In areas where natural gas is not available, the mod/con boiler in a dual-fuel system will likely be supplied by propane. The cost of a heat produced by burning propane in that boiler may be significantly higher than that of a heat delivered by the geothermal heat pump. For example, as of mid-December 2014, the price of propane in the Albany, N.Y., area was about $3.21 per gallon. If this propane fueled a mod/con boiler with an average thermal efficiency of 92%, the heat produced would have a unit cost of $38.03 per MMBtu (1 MMBtu =1,000,000 Btu).

The cost of electricity at the same location and time was about 16.3 cents per kilowatt•hour. If this electrical energy operated a geothermal heat pump with an average seasonal coefficient of performance of 3.2, the unit cost of the delivered heat would be about $14.92 per MMBtu, less than half that of propane under the stated conditions.

In situations like this, it makes sense to prioritize use of the lower-cost energy wherever possible. Reserve the more expensive energy to “top off” the load only when necessary.

 

Aim low

Designers also need to consider that the COP of a geothermal heat pump is very dependent on the water temperature supplied to its condenser. The lower this inlet water temperature, the higher the heat pump’s COP.

In most residential systems, the overall load consists of space heating and domestic water heating. The latter load starts at relatively low temperatures. For example, where I live in upstate New York, the annual average ground water temperature is about 50° F. It takes just as many Btu to raise a gallon of water from 50° to 60° as it does to raise that gallon from 110° to 120°. However, a heat pump is going to supply those low-temperature Btus at a much higher COP and, thus, at a lower $/MMBtu cost.

If your intent is to maximize heat pump performance, domestic water preheating is an opportunity you don’t want to overlook.

The partial system schematic shown in Figure 1 is configured to supply domestic water preheating, as well as space heating, to a low-temperature/highly zoned distribution system.

At design load conditions, the water temperature supplied to the distribution system from the buffer tank is 120°. This supply water temperature can be lowered as the outdoor temperature increases. At half load, the supply water temperature only needs to be about 95°. This keeps the heat pump, as well as the mod/con boiler if it’s needed, operating at the highest possible efficiency.

This configuration also maximizes the use of the heat pump for domestic water preheating. Whenever there is a hot water fixture demand of 0.8 gal. per min. or higher, the flow switch marked (FS1) closes its contacts. This turns on circulator (P1B) via a relay. The hottest water at the top of the buffer tank is immediately routed through the primary side of heat exchanger (HX1).

Cold domestic water passes through the other side of this heat exchanger, in a counterflow direction, to maximize heat absorption. The preheated domestic water then passes into the cold inlet of the indirect water heater. This reduces the heat that must be supplied by the mod/con boiler.

For this application, a heat exchanger should be selected that can heat the domestic water, in a single pass, to no more than 10° of the temperature at the top of the buffer tank. An even smaller approach to temperature differences is possible if you want to spend a bit more on the heat exchanger.

I suggest using software such as FlatPlateSELECT (freely accessed at www.flatplateselect.com) to quickly evaluate the performance tradeoffs.

Here’s an example. Assume a situation in which heated water from the buffer tank enters the primary side of the heat exchanger at 120° F. Cold domestic water enters the secondary side of the heat exchanger at 50° and 4 gpm. The FlatPlateSELECT software indicates that a 5-in x 12–in. x 30-plate-deep brazed-plate heat exchanger will yield a domestic water preheat temperature of 110°.

However, increasing the number of plates on the heat exchanger from 30 to 36 yields a preheat temperature of 115°. For the cost of six additional plates on the heat exchanger, there is a 7% increase of preheating provided (assuming a total domestic water temperature rise from 50° to 120°).

Another benefit of using the external heat exchanger for domestic water preheating is that the domestic water side can be easily flushed out using the combination isolation/flushing valves shown in Figure 1. If fouled to the point of no return, the heat exchanger also can be replaced without messing with the buffer tank. If ever needed, the piping shown allows a temporary bypass of the domestic water side of the heat exchanger. With the bypass open, cold water would flow directly into the indirect water heater and all heating would be done by the mod/con boiler.

 

Take what you can

Because the temperature of the buffer tank is controlled by outdoor reset, the highest domestic water preheat temperature will occur under design load conditions when the buffer tank is warmest. Under partial load conditions, the existing preheat temperature will be lower.

There is a performance tradeoff between keeping the buffer tank temperature as low as possible to maximize COP for space heating vs. sacrificing a slight amount of COP to keep the buffer tank warmer under partial load conditions and enable a higher domestic water preheating temperature. The optimal strategy would depend on the exact load requirements for both space heating and domestic water heating.

I suggest setting the lower limit of the outdoor reset controller so the minimum temperature of the buffer tank is in the range of 85° to 90°. This will increase the domestic water preheating effect under partial space-heating loads but only slightly reduce the COP of the heat pump. It also keeps the supply water temperature under partial-load space heating low enough that a mixing valve is not needed.

The wiring for the system in Figure 1 is shown in Figure 2.

For maximum water-heating capacity, the mod/con boiler should be configured for priority domestic water heating. This temporarily turns off the circulator between the boiler and buffer tank and directs full boiler output to the indirect water heater. The heat pump can still operate to supply heat to the buffer tank, and some of that heat can still be used for preheating domestic water before it enters the indirect.

The preheated water entering the indirect tank will substantially increase both its first hour DHW capacity and its continuous DHW demand capacity. If this capacity is not needed, I suggest turning down the boiler’s target temperature during the DHW mode. This reduces the heat transfer capacity of the indirect’s internal coil heat exchanger.

The benefit comes from conditions that potentially allow the boiler to operate in condensing mode during the DHW mode. The degree of condensing mode operation depends on the temperature of the water returning to the boiler from the indirect tank. Lower is better. From the standpoint of thermal efficiency, the goal is to find the lowest boiler supply temperature at which adequate DHW delivery capacity is achieved.

What about cooling? Admittedly, this piping and control configuration is best suited for systems that are dominated by heating operation. That said, it can still provide benefits during cooling mode operation. The best configuration depends on how chilled water from the heat pump is used during cooling operation.

If the same buffer tank will store chilled water during the cooling season, circulator (P1B) in Figure 1 needs to be disabled during cooling operation. You could even valve off domestic water flow through the heat exchanger and instead direct cold domestic water directly into the cold port of the indirect water heater.

If the heat pump supplies chilled water to the buffer tank and is equipped with a desuperheater for domestic water heating, the desuperheater circuit should be connected to the indirect water heater. This will redirect about 10% of the heat into the indirect water heater that would otherwise be dissipated into the earth loop. Whenever possible, connect the desuperheater circuit so that it works with the coolest water within the indirect tank.

If the buffer tank is not used to store chilled water, the desuperheater circuit can connect to the buffer tank. Again, this sends about 10% of the heat into the buffer tank that would otherwise be dissipated into the earth loop and, thus, make it available for domestic water preheating. It also keeps the desuperheater circuit part of the closed hydronic system, rather than having it operate with domestic water. The latter is more likely to foul up the surfaces in the desuperheater over time, especially if the water quality is not great.

The approach we’ve discussed allows the best thermodynamic match between the performance characteristics of the heat pump and the availability of a low-temperature load (e.g., domestic water preheating). It also provides the “afterburner” kick you may need if periods of high domestic hot water demand are possible. If you’re planning systems that combine heat pumps and mod/con boilers, perhaps you can work this into your designs.

Download the PDF of this article here


HELPFUL LINKS:

  • Contact Us
  • STAY CONNECTED WITH US VIA SOCIAL MEDIA
KEYWORDS: geothermal green heating heat pumps high-efficiency boilers renewable energy systems

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Siegenthaler

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

NIBCO Press Solutions

NIBCO Press Solutions

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

Plumbing equpment parts and wrench on the white background close up.

Plumbing & Mechanical 2025 Plumbing Tools Survey

Six tankless water heaters that feed the nutraceutical manufacturer’s operations.

How to deliver large volumes of hot water quickly and intermittently

Latin American plumber fixing a toilet in the bathroom.

Troubleshooting common airflow plumbing issues

PM BEMIS June 25 Free Webinar: Optimizing Plumbing Solutions for Single-Family, Multi-Family & Public Spaces

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • PME0123-Siggy-slide1.jpg

    John Siegenthaler: Modifying high-temperature distribution systems for lower-temperature operation — part two

    See More
  • Siegenthaler PM

    John Siegenthaler: Low temperature leverage

    See More
  • John Siegenthaler Hydrolics Workshop

    Piping for wood-fueled biomass boiler systems: Part 1

    See More
×
December correction Kudos to PM reader Mike Mills of Design Air in Milwaukee for a close look at Figure 1 in the December 2014 Hydronics Workshop column. He noticed there was no expansion tank shown on the water side of the system. Such a tank is definitely needed. Hereâ??s a corrected drawing.
Figure 1.
Figure 2.

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!