• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Columns

Boiler Jacket Loss

The International Energy Conservation Code addresses the controversial subject.

By Ray Wohlfarth
Wohlfarth slide1
Figure 1. Isolation valve solution to reducing boiler jacket loss.
Wohlfarth slide2
Figure 2. Primary/secondary piping solution to reduce boiler jacket loss.
Wohlfarth slide1
Wohlfarth slide2
March 15, 2013

A debate has continued in the industry about whether boiler jacket loss should be factored into the calculation of boiler efficiency. Most of the old boiler rooms were very toasty places. If the old pipe insulation was removed, the boiler room was downright hot. While some believe the heat lost through the boiler jacket into the boiler room is wasted, others feel it is useful heat. Jacket loss is the transfer of heat from the boiler through the jacket and into the boiler room.

I would rather not get in the middle of that controversy but I do know one thing: Jacket loss trumps polyester pants every time.

A no-heat call came in from a client. I was on a sales call at the time and stopped at the client’s building on the way back. I was wearing nice polyester pants. It was the ’80s, after all. I bent over and saw that the pilot was off for the boiler. I lit the pilot and watched as the main burners started with a loud whoosh. I informed the maintenance man about what I found and the repair I had performed. We chatted for a while and he informed me that the burner flame would sometimes look yellow.

Before leaving, I knelt down to watch the flame. I was only there for a minute or two when I felt the heat on my knee and thigh. I jumped up but it was too late. The pants had shriveled from the heat and looked like an old raisin. As I stood up, I saw that the length of my pants was now above my ankle. I was red-faced and upset. “Hey, look at Ray with his flood pants,” one of the guys said laughingly to his co-worker. I would get teased for years over that fiasco.

IECC remedies

While I do not wish to weigh in on the benefits or losses of jacket loss, the International Energy Conservation Code believes it is something that should be addressed. The code stipulates that boilers should either be piped with primary/secondary piping or use an isolation valve that limits flow through the idle boiler.

In a primary/secondary system (Figure 2), each boiler has its own pump. If the boiler is idle, the pump will not operate. This will eliminate the water flow through the idle boiler. The pipe connections to and from each boiler must be no more than 12 in. apart on the primary loop. This isolates the boiler from the hot system water. It is the most common piping arrangement now, preferred by most boiler manufacturers. In addition to increased system efficiency, it assures proper flow for each boiler as each has its own pump, properly sized for the correct gallons per minute.

The other option in the energy code is to use isolation valves (Figure 1). A few factors should be considered when these are installed. The first is flow. When one boiler is off and is isolated from the system pump, all the flow will go through the boiler that is firing. This flow could be excessive and may be greater than the manufacturer recommends.

Remember, the system pump is sized to distribute the heat from all the boilers, plus a safety factor. The velocity of the water could be high enough that the boiler will not be able to give up its heat into the water. This could be very expensive as the boiler will lose its efficiency. A quick check of the temperature rise across the boilers will tell you if this is happening. Most boilers are designed for a 20° F temperature rise from the return to the supply when firing. If the temperature rise is low, the heat is not being transferred into the water. Make sure to check the temperature requirements of the boiler manufacturer.

Another factor to consider when using isolation valves is that the limit controls may trip and the building will be without heat until the reset button is pushed. When the burner shuts off, the internal boiler components will continue to generate heat for a short while. Since there is no flow due to the closed valve, the internal boiler temperature will continue to climb. I have witnessed temperatures rises of 30° or more when the flow is shut off on a recently ended heat cycle. In many instances, this will be enough to trip the safety limit switch, which would be a manual reset-type of switch.

If using an isolation valve, a time delay should be used that will not allow the isolation valve to close until the temperature stops rising. This is usually 10 to 20 minutes after the burner shuts off.

A time delay also should be considered for steam boilers if isolation valves are installed on them. A vacuum breaker may be required as well if the boiler will be isolated from the steam system and allowed to condense.

Heating up lunch

The last factor to consider when using either of these piping systems is that the boiler room will be much cooler than it was with the old boilers, which had flow continually through them. In some instances, a separate heater may be required to provide heat for the boiler room. I realize that, in an ironic sort of way, we are now back to where we started.

In one of my first projects where the boilers were installed using primary/secondary piping, I realized the boiler room was much cooler than it was with the old boiler. Upon the completion of the project, the installer informed me with a sheepish grin that the custodian did not like our boilers at all.

I asked the custodian what was wrong. He shrugged his shoulders and said, “I don’t like ’em.” I could not believe it, so after a couple questions, I heard the real reason why he didn’t like my new high-efficiency boilers. The custodian used to place his lunch under the old atmospheric boiler and the jacket loss heated his lunch in the winter for the past 40 years. He could not do that anymore. I smiled and bought an inexpensive toaster oven for him. He loved my boilers then. 


HELPFUL LINKS:

  • Contact Plumbing & Mechanical
  • Follow PM on Twitter!
  • Like PM on Facebook!
KEYWORDS: boiler high-efficiency boilers piping systems plumbing codes

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Wohlfarth

Ray Wohlfarth is the author of “Lessons Learned in a Boiler Room: A common-sense approach to servicing and installing commercial boilers.” In his spare time, he is president of Fire & Ice in Pittsburgh, Pa. Ray writes a monthly newsletter on commercial boilers. He can be reached at 412/343-4110.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

NIBCO Press Solutions

NIBCO Press Solutions

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

The interior of a government building.

President Trump signs executive order promoting skilled trades and apprenticeships

Figure 1 is a sketch of the flow problems of the current plumbing system.

Hydronic heating glitch solved: Why adding a circulator won't fix primary loop flow issue

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

PM BEMIS June 25 Free Webinar: Optimizing Plumbing Solutions for Single-Family, Multi-Family & Public Spaces

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Ray Wohlfarth

    The worst boiler accident

    See More
  • Ray Wohlfarth

    Boiler safety lessons

    See More
  • Boiler room 'myths'

    See More
×
Figure 1. Isolation valve solution to reducing boiler jacket loss.
Figure 2. Primary/secondary piping solution to reduce boiler jacket loss.

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!