• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Columns

Vertical heating

By Dan Holohan
December 1, 2012
Unraveling the mysteries of early 20th century high-rise steam-heating systems.

The Breakers mansion, the Newport, R.I., summer home of the Vanderbilt family. Photo credit: stockphoto.com/Pgiam


So my buddy gets this large, prestigious job in Manhattan, which is going to make him even more money in the years to come because billionaires who build such city houses are jealous of each other. They all want to own the mechanical artists that the other billionaires have. There’s a tradition for this.

When Mr. Vanderbilt had The Breakers, his 65,000-sq.-ft. summer cottage in Newport, R.I., built, he included piping for hot and cold city water, seawater and rainwater. I know this because I once stared at all those pipes one day and scratched my head. You see after construction, Mr. Vanderbilt had all the blueprints and plans for the cottage burned so no one could ever do again what he had done. So there.

My buddy, who is a very successful New York City contractor, got this job from the general contractor, who had been working with a Long Island plumbing-and-heating company. He told my friend: “Long Island plumbers don’t know how to do vertical heating. The houses on Long Island are all horizontal. Long Island guys are great at horizontal heating, but I can’t afford to mess up on this one. That’s why I want you. You guys do vertical heating.”

So my buddy, being a smart man, smiled and agreed. Vertical heating? Absolutely! Which proves, once again, that if you set yourself up in the right place at the right time and you are willing not to argue with people who are sometimes ridiculous, life will smile upon you and you will come out of the deal smelling like new cars and cinnamon buns.

As did my buddy.

This was all on my mind when I visited a 1901 steam-heated office building on Fifth Avenue in Manhattan. A friend had asked me to take a look because her company was working on greening the building. “Greening,” in case you don’t know, is a 21st-century way of saying, “Let’s see if we can get rid of the overheating, underheating, high fuel bills and banging pipes in this old steam system.”

But first, she had to figure out what she was dealing with because this building had some very serious vertical heating and more than a hundred years’ worth of hands touching it.

It sounded like it held a good story and the place is just four blocks from the house where Teddy Roosevelt was born, a place that was on my Bucket List, so I said I would take a look.

Teddy was born in a brownstone building on East 20th Street, just off Park Avenue and the 45-minute tour is free. I was a bit disappointed to learn the building that is there now is a 1920s recreation of the original, which was knocked down at the turn of the century to make room for a store. Fireplaces and 1920s steam heat are in the place now, nothing that grabbed me by the lapels, but it was good to listen to the docent go on about the history of the neighborhood.

When Teddy lived in the neighborhood, it was a suburb of Manhattan. Imagine that. And then the stores came and the rich folks all moved farther uptown.

So when I arrived at the office building, which was once all stores, I had the neighborhood history in mind and I was able to see the place through time and imagine what once was. That helps when you’re looking at a building that many have messed with over the past 111 years.

My friend was curious about the steam system in this building because it was both one-pipe and two-pipe steam. She told me the building was originally 10 stories tall and that’s where the two-pipe steam is, but then, very early in the last century, another three stories were added to the place and these floors all had one-pipe steam. Could they work together? Yes, they could, and we set out to take a look.

We got into the elevator and began with a whisper-quiet law office. A woman in an expensive suit met us and brought us into the room where they take depositions. “Is it noisy in here?” I asked. “I mean the pipes, not the clients.”

“Oh, yes,” she whispered.

“When is it noisy?” I whispered back because the when and the where are very important things to know when looking at an old steam system.

“On Monday mornings. It’s crazy on Monday mornings.”

“Is it hot in here?”

“Like you can’t even stand it,” she whispered through clenched teeth.

The missing link

I saw the problem and asked the questions to confirm what I already suspected. Thermostatic steam traps for radiators arrived in 1905. This building went up in 1901, so the builder used a two-pipe, air vent system for the first phase. The supply main has a diameter of 2 in. and rises from the basement to the top floor. The return main is 1 1/2 in. and stands right next to the supply main. Off these two vertical pipes are the radiators, set like rungs on a ladder.

This system is the missing link between one- and two-pipe steam. It was used in tall buildings in the early 1900s because a building this tall wouldn’t work well with one-pipe steam if the supply came up from the basement. All the condensate draining back down that tall riser would kill the steam trying to make its way up. So they put air vents on all the radiators and drained the condensate from each radiator through a return riser.

They would make that riser one size smaller than the supply riser so the steam would favor the supply on start-up, but once the system was hot, there was going to be steam in both the supply and return risers, and that was perfectly normal.

The law office was overheating because the radiators were sized to heat the space when they had 1901 single-pane windows. Now they have modern windows and they were gagging. So a contractor installed thermostatic radiator valves on the supply side of all the radiators. The steam looked at those TRVs, shrugged and used the return lines to overheat the radiators. Steam is like that. It’s just looking for an air vent.

The system had a heat timer that lowered the temperature over the weekend, so when the steam returned on Monday morning, it hit tons of cold steel and made lots of condensate, which it knocked around like a demolition derby. After the pipes got hot, there was less condensate and less banging, but still that oppressive heat. I explained that the supply-side TRVs weren’t going to work. They had to use the sort of TRV that went between the air vent and the radiator. Either that or they would have to convince all the other tenants in the building to install supply-side TRVs and thermostatic radiator traps. Good luck with that.

We went from floor to floor and found similar situations. This is a building where the companies buy the floors they’re on and then never speak to their neighbors. They’re all sharing an antique steam system and they think they can do what they want with just their part of it. They can, of course, and they do, but it won’t work because of the physics. It’s tough arguing with physics.

The one-pipe radiators on the top three floors connect off the supply riser and drain back into it. Acres of people work quietly at computers on these floors. In some of the spaces, the architects had the heating contractors move the radiators between those two windows way over there. Having the radiators in the middle of the windows was aesthetically pleasing to the eye, but the horizontal pipes running to those now-far-from-the-return-riser radiators either didn’t pitch back toward the return riser, or pitched the other way, so they were arguing with gravity.

I asked the quiet people at the computers if their radiators were noisy. They all winced.

Downstairs in the boiler room, I checked the pressuretrol and found the system set to run between 5 1/2 psi and 7 1/2 psi, which is about five times higher than it should be and well beyond the operating pressure of one-pipe steam air vents. That means the steam pressure was able to lock closed the air vents after the first cycle. That leads to very uneven heating.

The superintendent will respond to those problems by raising the pressure on the boiler even higher. He does this because he can and because he is not a student of vertical heating.

He probably lives on Long Island.

Links

  • Contact Plumbing & Mechanical
  • HeatingHelp.com
  • Follow PM on Twitter!
  • Like PM on Facebook!
KEYWORDS: hydronic heat steam heat

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Holohan

Dan Holohan and his wife, Marianne, founded www.heatinghelp.com in 1997. You can reach Dan Holohan at dan@heatinghelp.com. He loves hearing from you!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

NIBCO Press Solutions

NIBCO Press Solutions

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

The interior of a government building.

President Trump signs executive order promoting skilled trades and apprenticeships

Figure 1 is a sketch of the flow problems of the current plumbing system.

Hydronic heating glitch solved: Why adding a circulator won't fix primary loop flow issue

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

PM BEMIS June 25 Free Webinar: Optimizing Plumbing Solutions for Single-Family, Multi-Family & Public Spaces

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Holohan

    Fishing guides and heating techs

    See More
  • Holohan

    Back away from old heating equipment you don’t understand

    See More
  • Holohan

    A new look at vacuum heating

    See More

Events

View AllSubmit An Event
  • August 26, 2014

    Free Webinar: Low Temperature Heat Emitter Options in Hydronic Systems

    With proper design, you can create systems that require supply water temperatures no higher than 120° F under design load conditions.
  • June 13, 2016

    Advanced Radiant Design with Mark Eatherton

    This course drills deep into the engineering aspects of tube length, tube center density, tube size and other factors affecting hydronic radiant heating systems.
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!