• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Columns

Beyond Series Circuits
John Siegenthaler, PE

By John Siegenthaler, P.E.
November 1, 2004
A modern approach to baseboard heating.

Figure 1
I grew up in ranch house built in the 1950s and heated by fin-tube baseboard. It had a split-series loop distribution system, a single B&G series 100 circulator pumping into the oil-fired Thatcher boiler, and a tankless coil for domestic water heating. It was, in all respects, a classic residential hot water heating system of its time.

Like other systems of that vintage, it contained hundreds of segments of 3/4-inch copper tubing and at least as many 90-degree elbows. Someone spent a lot of time measuring, cutting, cleaning, fluxing and soldering all that copper together. My guess is that they were probably paid something like $2 to $3 per hour to do so.

Short of finding a new Thatcher fire-tube boiler, you could duplicate that system today. You could still solder all that copper tubing together, still install a tankless coil for DHW, and still pump into the boiler. The newly minted system would still experience the effects of decreasing water temperature from one series-connected baseboard to the next. The room at the end of the circuit would still be cooler than the room at the start of the circuit. Those new baseboards would still produce the familiar ticking sounds as hot water raced through cool piping at the start of each heating cycle. Oh, and you could still expect an occasional call to bleed air from that new system.

Most seasoned "hydronicians" (as Mark Eatherton calls them) know that the methods and materials they now use increasingly differ from those used by a previous generation of heating professionals. This is not a put down of the systems designed and installed by our predecessors, it's an acknowledgement that the technological possibilities associated with hydronic heating continue to advance.

At the same time, issues such as labor costs and skill level demand frequent re-examination of design and installation options. Those who plan a profitable career in hydronic heating must keep pace with these changes. It's certainly true with hydronic radiant heating, and it's also true with the more "pedestrian" hydronic heat emitter - fin-tube baseboard. This month we'll exam ways to enhance the performance and versatility of fin-tube baseboard systems, and see that you can indeed teach an old heat emitter new tricks.

Figure 2

Why Relive The Past?

Traditionally, most residential baseboard systems are built using series piping circuits. Although simple in concept, series circuits always produce temperature drops from one baseboard to the next. If this effect is not properly factored in during design, the result will be overheated rooms near the beginning of the loop and underheated rooms near the end, especially on long circuits. Series loops also severely limit the ability to zone systems or balance heat output to compensate for internal heat gains. Long series circuits can also produce high head loss and reduced flow rates that, in turn, reduce thermal output.

Parallel-piped systems offer far fewer nuances. Because each branch circuit receives the same water temperature, it's easy to select a design supply temperature and size each heat emitter based on it. Gone is the need to compensate for temperature drop from one baseboard to the next. Parallel systems also allow the flow through each branch to be individually controlled, and thus allow for easy zoning and balancing.

Although parallel-piped baseboard systems can be constructed using rigid tubing, a faster and more flexible approach is a "homerun" system using PEX or PEX-AL-PEX tubing (see Figure 1). The baseboard in each room is individually supplied from a common manifold station just like those used for radiant floor heating.

Figure 3
In many cases, shorter lengths of PEX or PEX-AL-PEX tubing left over from a previous radiant job can be used for the homerun supplies or returns. Special elbows for connecting PEX or PEX-AL-PEX tubing to a finned-tube element are now available from many tubing suppliers. One example is shown in Figure 2.

Homerun systems typically use more linear feet of tubing than do series loops, but that small flexible tubing goes in fast and easy, especially in new construction. In retrofit jobs, small flexible tubing greatly reduces the need to open existing walls or ceilings to install piping, often allowing installation options not possible with rigid tubing. I often tell people that if they can route an electrical cable from point A to point B in the building, they can also likely route two lengths of small flexible tubing between those same locations.

C-shaped CPVC tubing support clips (see Figure 3) in combination with 1/2-inch PEX-AL-PEX tubing work great for homerun circuits. One screw holds the clip to the framing. The tubing just snaps into the open end, and can easily slide back and forth due to thermal expansion/contraction. The aluminum core in PEX-AL-PEX tubing makes it easy to hand-form the tubing to the required shape, and helps it stay in that shape once uncoiled.

When the tubing runs reach the baseboard, just hand-form the needed bends and pop the tubing up through holes sized 3/8-inch larger than the OD of the tubing. The oversized holes accommodate expansion movement of the fin-tube element without binding the tubing against the subflooring. For a professional appearance, slip a small escutcheon plate over each tube before connecting it to the baseboard fitting. In total, you'll make two soldered joints and two wrench-tightened joints at each baseboard, a far cry from the 16 soldered joints often required when rigid piping and 90-degree elbows are used.

A Few More Amenities

To get the most out of baseboards supplied by a homerun distribution system, you'll want to include a few more details, including:
  • Room-by-room zoning controls;
  • Outdoor reset of supply water temperature; and
  • Differential pressure control.
One of the simplest ways to achieve room-by-room zoning control is by installing a thermostatic radiator valve on the supply side of each baseboard. The thermostatic head can pass through a hole on the end of the baseboard end cap as shown in Figure 4. In this location, the thermostatic head isn't affected by warm air currents rising from the baseboard. If the client doesn't want to bend over to adjust the thermostatic head, install an actuator with a capillary tube leading to a wall-mounted dial. Most manufacturers of TRVs offer these options. Be sure to order the proper "side-mounted" valve body for this application. Flow goes into the side port of the valve and out the end port.

Figure 4
If you would rather stick with electrical controls, install 24VAC valve actuators at the manifold station and wire them to low-voltage thermostats in each room. This approach offers the possibility of using programmable thermostats or even thermostats that communicate with each other, but is definitely more expensive than installing TRVs.

To smoothen system response and keep the distribution system as quiet as possible, you'll also want to regulate the water temperature supplied to the manifold(s) using either boiler reset control or mixing reset control.

Boiler reset control is simpler and less expensive than mixing reset control. It also has a proven record of reducing fuel costs. However, conventional gas- and oil-fired boilers require protection against sustained flue gas condensation, and thus limit how low the boiler reset control can operate. Supply temperatures of less than 140 degrees F should not be used unless the boiler manufacturer specifically states that lower-temperature operation will not harm the boiler. Because of minimum boiler temperature constraints, there will be times when the TRVs must throttle to very low flow rates to prevent overheating. It is imperative to use differential pressure control to prevent flow noise in such situations.

Figure 5
Mixing reset control allows the water temperature supplied to the baseboards to be lowered right down to room temperature when necessary. When the mixing controls are properly set, the supply water temperature from the mixing device is just right for the prevailing load conditions. This allows for nearly continuous water circulation in the system, which practically eliminates expansion noises in piping.

Keep in mind that several currently available mixing reset controls also provide boiler reset capability as well as the intelligence to turn on the distribution circulator when outdoor temperatures drop below a set threshold temperature (typically around 65 degrees F). They are ideal "system controls" for a homerun system supplying baseboard.

The final component this type of system needs is a differential pressure bypass valve. This valve prevents the circulator from operating at high differential pressure when most of the TRVs or valve actuators are closed. Unchecked, high differential pressure can cause flow noise and increase circulator wear. The shaft of the bypass valve should be adjusted to eliminate any flow noise present when each homerun circuit is operating by itself.

The fully trimmed system concept is shown in Figure 5. Keep in mind that this arrangement could also serve as a subsystem to supply baseboard heating in part of the building while other areas are served by radiant heating. Some of those homerun circuits could also be used to supply panel radiators or heated towel racks

I still consider fin-tube baseboard a "staple" of residential hydronic heating in North America. When enhanced by the modern hardware and design concepts we've discussed, this proven heat emitter delivers even smoother and quieter comfort. You'll notice the difference and so will your customers. Chances are the techniques we've discussed will soon become your "norm" for baseboard installations.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Siegenthaler

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
close

1 COMPLIMENTARY ARTICLE(S) LEFT

Loader

Already a Registered User? Sign in now.

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

NIBCO Press Solutions

NIBCO Press Solutions

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

The interior of a government building.

President Trump signs executive order promoting skilled trades and apprenticeships

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

Figure 1 is a sketch of the flow problems of the current plumbing system.

Hydronic heating glitch solved: Why adding a circulator won't fix primary loop flow issue

PMCE Home-X April 29 Free Webinar: From Legacy to Leadership: Preparing Your Home Services Business for the Next Generation

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Is 2 Foot Too Far?
    John Siegenthaler

    See More
  • Siegenthaler PM

    John Siegenthaler: 5 more products the hydronics industry needs

    See More
  • John Siegenthaler’s Top 25 Articles

    John Siegenthaler’s Top 25 most-read articles

    See More
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!