• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Plumbing & Mechanical Engineer David Dexter: Plumbing Talking Points

Plumbing Talking Points

David Dexter: Running horizontal drains

A discussion on the minimum burial depth or pipe cover required.

By David Dexter
Running horizontal drains

georgeclerk/E+ via Getty Images.

June 8, 2022

Let us get down in the dirt, or at least “backfill.” A recent discussion on ASPE Connect’s “Open Forum” was entitled “Minimum Pipe Cover when Calculating Invert Under Building Slab for PVC Sanitary.” The post related to the conflicting information received when reviewing inverts with plumbing contractors.  So the question became: “When running horizontal drains (whether they be sanitary or storm) underneath a building slab, is there a typical minimum burial depth or pipe cover required?  Or is it acceptable to locate the piping tight to the underside of the slab?”

So, where shall we begin the discussion? As with any design project, one must deal with the specifics of that project and the site conditions. No code, standard or manufacturer’s installation instruction can cover or address all of the potential complexities of those specific site and project conditions. As a design professional, one must consider the information provided by the codes, standards and manufacturers’ installation instructions while applying sound engineering judgment.

After giving the question some thought, my initial response was: Interesting question that has many challenging inputs and differing solutions. Both the ASTM standards and the manufacturers' installation instructions are intended to protect the installed material from potential damage. But, ultimately, it is the Engineer-Of-Record (EOR) who has liability for the design. The contractor is expected to install the system in accordance with the Contract Documents using appropriate means and methods. While conflicting information between various members of the design/construction team may occur, it is the EOR who must make the final decision to which the contractors must comply.

The question of minimum backfill cover is related to the protection of the piping material from potential physical damage. So, one must look at the loading potentially that could be applied to the piping material. This loading can be complicated, as one must consider both the final installed loading along with potential loading imposed by the construction process, contractor equipment and fieldwork.

PVC adds additional challenges as it can flex as well as distort. Hence, the backfill needs to be such as to maintain the piping slope, alignment and shape. Therefore, the backfill needs to provide a firm and solid base upon which the piping can rest. That backfill also needs to assure that any imposed loading cannot cause the piping to move or deform.

PVC piping can certainly be installed directly below the slab. This is provided there is no direct contact with the slab, which could be abrasive to the material and no imposed load is transferred to the installed piping. It also requires that no construction load, such as equipment passing over the piping, is allowed. Additionally, the type of backfill material needs to be considered. Where piping materials can settle or shift when subjected to an imposed load are not practical or an appropriate selection.

It is the contractors' responsibility to appropriately install the system and to protect that installed work throughout the construction process, not the EOR. The EOR's design is intended to provide for a long-term, workable and durable system when fully installed in accordance with the Contract Documents.

As an example, I had to review and recommend corrective actions for a design/build contractor that had installed PVC in a medical office building. The plumbing contractor had installed PVC throughout, backfilling with "grits." Grits are small granular gravel that shifts and moves under imposed loading. As is typical, the minimum cover was 18 inches to allow for the upturn to closet arms, etc. The piping left the building with about 4.5 feet of cover. The contractors did nothing special to protect the installed sanitary system. Additionally, it did not appear that any bedding or compacted fill had been placed around the piping in accordance with the manufacturers’ installation instructions. Heavy construction equipment was allowed to continually drive over the area, including the trenching the enclosed the sanitary piping. As a result, the building drain flexed and formed "belles" (changes in slope) in its run. These belles held waste products and toilet tissue, resulting in frequent stoppages. Needless to say, the owner was not happy. The design/build contractor wanted to know what went wrong.

The answer was the inappropriate use of grits as an acceptable backfill material; as well as not protecting the trenched areas from seeing equipment-imposed loading. This loading allowed the piping to flex and yes, deform. The backfill needs to be such that it can be compacted and will not allow the piping material to flex, shift or deform under any imposed loading, installation construction traffic or building imposed loading.

As this facility was in operation, a large section of the building drain was abandoned and rerouted out the side of the building to reconnect with the building sewer. The design/build contractor was then provided with a set of guide specifications to include in their master specifications. Part of the reason they had allowed grit was because the local purveyor had them in their specification. However, the building sanitary specification followed the ASTM for the first couple of feet and then completed the backfill with grits. Exterior sewers generally are at least covered by 5 feet of backfill.

One of the discussion contributors had several points that I offered the following responses for consideration:

  • “How have you interpreted this?” Exactly as stated, the EOR needs to evaluate the specific project condition. This includes anticipating the conditions that potentially can occur during the construction process;
  • “How have you evaluated the project conditions and justified the integrity of the pipe for certain depths and backfill methods and materials?” The EOR must consider how best to protect the installed piping material for installation as well as complete/operational loading and select the backfill materials that can best protect the piping;
  • “Have you just gone with ASTM’s recommendation of 36 inches of cover?” Yes and no, the recommendations are not specific to the project.  Beginning with 36" of cover is not practical if one wishes to avoid a lift station;
  • “Some general recommendations have been given, but is past experience enough to stand behind the design?” General recommendations are only a starting point. The EOR needs to look at the overall systems a select specific backfill based on the conditions along the piping run. Shallow cover will require different backfill and protection verse areas where the cover is deeper and has less risk of equipment damage;
  • “What has allowed starting at 18 inches below slab when the standard and installation instructions recommend otherwise?” Starting at 18 inches or even 6 inches is design specific, requiring specific considerations to be addressed. Standards and installation instructions are a guide, not something set in stone. After all, it is engineering and left to the discretion of the EOR;
  • “Does anyone have experience with installing plastic pipe shallow and backfilling with controlled density fill that doesn’t require compaction? If so, how was the retainage of pipe strength accomplished?” The standard does not seem to include that method unless I’ve missed it.  Controlled density fill is viable as a means of backfill that will remain in place. However, it is not normally the initial bedding material for the PVC piping nor the first 6 inches of cover over the piping. This needs to be closer to the ASTM/installation instruction guidance;
  • “Can the contractor reasonably do their work around the site without driving vehicles and machinery over the installed pipe when it is shallow?” This is a contractor’s responsibility as part of their means and methods. They need to coordinate with the other contractors and take precautions to protect their installed systems; and
  • “Do you just give up on plastic pipe and go back to cast iron?” PVC is viable as a material, just as cast iron has its uses. No one material is perfect for every use. Materials need to be selected based on application as well as location.”

One of the contributors to the discussion referred to IPC (International Plumbing Code) Section 306.3 Backfilling: “Backfill shall be free from discarded construction material and debris. Loose earth free from rocks, broken concrete and frozen chunks shall be placed in the trench in 6-inch (152 mm) layers and tamped in place until the crown of the pipe is covered by 12 inches (305 mm) of tamped earth. The backfill under and beside the pipe shall be compacted for pipe support. Backfill shall be brought up evenly on both sides of the pipe so that the pipe remains aligned. In instances where the manufacturer's instructions for materials are more restrictive than those prescribed by the code, the material shall be installed in accordance with the more restrictive requirement.”

The contributor also noted that the code does not differentiate between under a building or grade (which may not be true, as this is typically covered in Chapter 2 – Definitions), while the code does give some direction related to backfill. One should note that per code, you need a cover of 12 inches of tamped earth over the crown of the pipe. While this will work in certain areas, it is not an all-inclusive statement. Most codes defer to the manufacturers' requirements and installation instructions. "Earth" is not normally placed in trenches under structures, roadways, sidewalks, etc. Granular fill is generally the preferred backfill material. Regardless of the backfill material, compaction is always recommended to avoid settling over time and to assure the piping remains in a fixed position.

Another contributor offered comments found within the code commentary: “Piping in trenches under a slab-on-grade building need not be buried any more than what is necessary to provide for a full thickness of the concrete slab above.”

As this discussion shows, the burial depth and backfill methods and materials can quickly become complex. Adding to this complexity is the type of material or where that material is being placed within the project. These are all engineering issues that must be addressed. As an engineer, one needs to understand:

  • The material type: Metallic, polymer, ceramic, glass, etc.;
  • Where the material is being placed within the project: Exterior, under the slab, under roadway, under parking lot, under sidewalk, etc.;
  • Soil conditions into which the piping materials will be placed;
  • Is settling of the backfill material acceptable or must the final elevation be held constant? Backfill material selection: Earth, controlled density fill, compactable granular fill, sand, grits, gravel, etc.;
  • The ability of the backfill material to be compacted and hold that compaction;
  • Coordination between specification and the requirements of codes, standards, as well as purveyor requirements. Some of these may conflict with each other or may only apply to specific areas of the project;
  • How will burial depth impact the structural integrity of the slab;
  • How will the material react to the backfill in relation to the materials expansion coefficient; and
  • What impact can the construction process have on the installed material relative to transfer loading onto the material?

So, as design professionals, we must carefully consider the selection of the material and the backfill needed to protect it. We must also consider the construction process, not just the final installed system.


KEYWORDS: engineers piping plumbing engineers

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

David dexter headshot

David D. Dexter, FNSPE, FASPE, CPD, CPI, CPE, LEED BD+C, PE, is a registered professional engineer, certified plumbing inspector and plans examiner and master plumber. He has more than 40 years of experience in the installation and design of plumbing systems, specializing in plumbing, fire protection and HVAC design as well as forensics related to mechanical system failures. Dexter also chairs ASPE’s Main Design Standards Committee and the ASPE Bylaws Committee.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

NIBCO Press Solutions

NIBCO Press Solutions

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

Watts Nexa mobile image

Behind the Wall: Where smart plumbing gets smarter

Six tankless water heaters that feed the nutraceutical manufacturer’s operations.

How to deliver large volumes of hot water quickly and intermittently

PMCE Home-X April 29 Free Webinar: From Legacy to Leadership: Preparing Your Home Services Business for the Next Generation

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • uniform flow

    David Dexter: Fitting Selection and proper flow

    See More
  • structural consultant

    David Dexter: Who designs the perimeter and foundation drainage system?

    See More
  • Digging deeper into thermal expansion

    David Dexter: Digging deeper into thermal expansion

    See More

Events

View AllSubmit An Event
  • November 13, 2024

    Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

    Join our deep dive into DOE’s new standards so you can future-proof your MEP practice. EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH
View AllSubmit An Event
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!