Exercise: Can
you spot a few “minor” details that should be changed before the sun shines on
this installation?
2. The collector circuit must
include a check valve to prevent nocturnal cooling caused by cool glycol in the
collectors descending down the supply pipe as warm glycol from the heat
exchanger rises up the return. Trust me, this can dump an entire tank’s worth
of heat back to the atmosphere in a few short hours.