search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Join Today
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • John Seigenthaler: Renewable Heating Design
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • PM After Dark
    • VIDEOS
    • EBOOKS
    • WEBINARS
  • RESOURCES
    • BIG BOOK DIRECTORY
    • REP LOCATOR
    • INDUSTRY CALENDAR
    • Letters to the Editor
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
  • JOIN
Plumbing & Mechanical Engineer

Case Engineering Providing MEP/FP Engineering on New Municipal Complex in Columbia, IL

The proposed $18 million Municipal Complex project will include renovation of an existing 35,000-square-foot, three-story office building constructed in 2020 to serve as Columbia’s new city hall.

By Plumbing & Mechanical Editorial Staff
A rendering of the EMS building.
Image courtesy of Case Engineering.
November 26, 2026

Case Engineering is partnering with architect Quadrant Design to provide MEP/FP engineering for a proposed Municipal Complex at 11800 Old Bluff Road in Columbia, IL.

The City of Columbia is located approx. 12 miles south of St. Louis, MO along the Mississippi River. Spanning 10.38 miles with a population of approx. 11,000 residents, Columbia was established as a French settlement in the mid-1600s and incorporated as a city in 1859.

The proposed $18 million Municipal Complex project will include renovation of an existing 35,000-square-foot, three-story office building constructed in 2020 to serve as Columbia’s new city hall. The ground floor will contain public spaces such as the council chambers, business offices and non-essential police functions. The building’s second and third floors will house offices for the city’s departments and officials.

A single-story, 9,450-square-foot addition will be added to the building for a new Columbia Police Station and 911 Dispatch Facility. The addition’s first floor will house police and dispatch functions and include a public lobby with connections to city hall, police department offices, locker rooms, 911 dispatch office spaces, police department processing, holding cells, interview rooms, data center and evidence processing. A safe room and safe baby drop-off area will be located near a new south entrance.

The addition will also include a storm shelter around the dispatch, detective, processing and holding cell areas. Since the addition must continue full operation in the event of severe weather or other emergency, MEP/FP services in the building will function independently from the city hall.

A new 8,400-square-foot facility will also be constructed at the north end of the parcel along DD Road for Columbia’s EMS Service. The facility will include offices, training room, day room and kitchen, fitness room, six bunk rooms, three individual restrooms with showers, laundry room, med storage space, covered patio, and an apparatus bay for six vehicles. The training and day room will be developed as a storm shelter.

The building’s bunk rooms will require their own thermostats, while alarm systems will include tone notification of dispatch calls. The building’s apparatus bay will also include heat tubes, power reels, floor drains, washing hoses, ventilation, and compressed air lines, among other specialized features.

“Case Engineering is honored to have been selected for this amazing project for the City of Columbia,” said Case Engineering Principal Jim Eyre, PE. “The MEP and fire protection design for the complex is a top priority, considering the importance of the services and staff that will be housed there. Our engineering will utilize state-of-the-art technology and design to ensure the safety of every occupant and consistent functionality of the buildings.”

The City of Columbia has yet to start construction or set an expected completion date for the new complex. S.M. Wilson has been selected as the general contractor.

KEYWORDS: engineering engineering firm

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2025 Next Gen ALL-STARS hero 1440

    2025 Next Gen All Stars: Top 20 Under 40 Plumbing Professionals

    This year’s group of NextGen All-Stars is full of young...
    Plumbing & Mechanical Contractor
    By: Kristen R. Bayles
  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Green Plumbing and Mechanical
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
Manage My Account
  • Join Plumbing & Mechanical
  • Manage My Preferences
  • Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Industrial cooling tower, pipe system and valves infrastructure on rooftop
    Sponsored byRemarcable

    Why Mechanical Contractors' CFOs See Job Costs Weeks Too Late

  • ClearLOC pipe fittings
    Sponsored byLegend

    How Plumbing Professionals Are Reducing Installation Time Through Smarter Connection Design

  • HyperPure® PE-RT tubing
    Sponsored byLegend

    Why Sustainable Innovation Will Shape the Future of Plastic Pipe

Popular Stories

Hydronic Mechanical Room

Hydronic Heating: Why 20°F Delta T Is Just a Number

Bell and Gossett Circulator

Moving Beyond Basic Circulator Replacement

Price Increase Image

PHCP-PVF Price Increases: November 2026

Meet PM After Dark - Watch the latest episode

Events

December 2, 2026

Smart Water: What’s Next for Plumbing Contractors

Join us for a panel discussion exploring the growing smart water market, including connected products and systems, installation opportunities, maintenance, and service.

View All Submit An Event

Poll

Data Center Projects

Does your company currently work on data center plumbing projects?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Related Articles

  • The Regional Workforce Innovation Center building.

    Case Engineering completes MEP design on St. Charles Community College’s new $41 million Regional Workforce Innovation Center

    See More
  • Darrell Case announcing the promotion of Matt Case, along with the firm's leadership team.

    Case Engineering, Inc. celebrating 30th anniversary, new leadership and retiring founder Darrell Case, PE, LEED AP

    See More
  • Electrical Engineer Adam Barney, Mechanical Engineer Luke Markovich, and Structural Engineer Spencer Bearden.

    Case Engineering Hires Structural, Electrical, Mechanical Engineers

    See More

Related Products

See More Products
  • The ACCA Job Safety (1).jpg

    The ACCA On-The-Job Safety Handbook (Pack of 5)

  • Lessons Learned: Connecting New Boilers to Old Pipes

  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

See More Products
×

Stay in the know on the latest plumbing & piping industry trends!

Get tailored content delivered your way.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • JOIN TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing