An installer is asked to pipe up two larger commercial air handlers supplied by a dual boiler setup. He’s asked to make it possible to supply either air handler from either boiler. The layout he comes up with is shown in Figure 1. The installer also places two air separators to intercept bubbles coming from either boiler.