This was quite a year for me on the home front. On fairly short notice, my wife and I found out that our daughter Heidi and her husband Andy would be building a house about 500 feet down the road from us. In February, we learned this project, which had been discussed from time to time as a “possibility,” was now a 100% “go,” and go now!
Heidi and Andy had worked up a rough layout for their new house, and my CAD system was soon humming along doing final dimensions, site planning, and — of course — drawing schematics for a hydronic heating system.