Millinocket is near utility-scale wind turbine farms where strong winter winds can lead to over-generation of electricity, surpassing local grid demand. While it might seem intuitive to shut down some generation equipment during such times, the process is not as simple as flipping a switch.
The public review period is open through July 21, 2025.
June 16, 2025
The updated draft, available for comment through July 21, aims to bring clarity, consistency and cross-sector alignment to emissions accounting across the built environment.