• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Plumbing & Mechanical ContractorRadiant Comfort Report

Tips for a successful snow-melt project

Providing safety and avoiding liability.

Electric Snow Melt 1

Snow-melt system design requires an accurate assessment of the intended construction area, the geographic area, the physical property layout and runoff of melted snow and ice.  Photo credit: Dave Yates/F. W. Behler

DSCN

The building owners wanted an electric snow-melt system rather than hydronic. The system uses Watts Radiant ProMelt cables.  Photo credit: Dave Yates/F. W. Behler

Electric Snow Melt 2

Shown are recorded surface temperatures once the electric snow-melt system was activated.  Photo credit: Dave Yates/F. W. Behler

Electric Snow Melt 1
DSCN
Electric Snow Melt 2
July 21, 2015

A great many similarities exist between hydronic and electric snow-melt systems. The concept is simple: Input heat-energy, melt snow/ice and provide safe passage for people. As the old saying goes, the devil is in the details. In addition to the primary reason — people safety and avoiding liability — the secondary reason for snow-melt systems is the damage to concrete, bricks and landscaping caused by snow-melt chemicals and mechanical snow removal.

Designing snow-melt systems requires an accurate assessment of the intended construction of the area to be treated, the geographic area, physical property layout and runoff of melted snow/ice. It certainly helps to have programs such as Watts’ RadiantWorks Pro (download here).

The training provided by the Radiant Professionals Alliance long ago gave me a rock-solid foundation of essential knowledge for radiant hydronic and electric heating and snow-melt systems. Ongoing educational opportunities are available for beginners and professionals alike (visit the RPA site).

A corporate grand entrance snow-melt system I worked on encompassed several distinct, but joined-together areas: a lower sidewalk adjoining the driveway; a tapering stairway; an expansive upper-landing pad with multistory all-glass entrance; and to either side, ADA-sloped sidewalks that meet up with the lower sidewalk. In total, this is 2,465-sq. ft. of snow-melt.

Early on during the design phase, the owners of the corporate center decided the snow-melt system was to be electric. Future plans would incorporate a rooftop array of photovoltaic panels to generate electricity and more than offset the watts used to melt snow.

Communication is an essential part of any successful snow-melt project and Lucas Hann at Watts became an integral part of my team. Little did Hann or I know, in the beginning, how crucial his role was to become!

The general contractor needed to know how to properly slope the concrete pads for runoff of melted snow and ice to areas where no foot traffic would take place and directed to area drains. The construction crew needed to be educated about their responsibilities for protecting the installed snow-melt products and I needed to know exactly where the saw-cut joints would be so that our crew knew where to dive down with the Watts ProMelt cables to keep them out of harm’s way.

Exact specifications were reviewed on concrete thickness, the 2–in.-thick layer of brick pavers and how the pavers would be installed. The pavers were to be bonded to the concrete with high-density mortar for transferring heat energy effectively to the surface. Location for our vault where the cable leads would tie onto the circuits and precise location of our sidewalk snow-melt sensor were hashed out early on in the project so I could lay out the grid-pattern for the seven loops of 277-volt cables.

In order to enhance the snow-melt system’s capabilities by providing 50 watts (170 Btu/hr.) per sq. ft., all ProMelt cables were installed on 3-in. centers and gently attached to the 6-ft. by 6-ft. steel grid with plastic zip-ties. The grid was elevated by using plastic chairs to keep the electric snow-melt cables just 2 in. below the surface of the concrete pads. The snow-melt sensor’s housing was braced in place with layers of brick with an electrical conduit run from the sensor’s well to the electric vault.

We installed the Watts 200-amp, 277-volt control panel within the centrally located main electrical room located on an upper floor with conduits run from it to the outdoor below-grade vault. The electrical conduits were run above the first floor’s suspended ceiling and drywall-encased structural support beams provided a convenient chase for the final drop before drilling through the exterior below-grade wall. At the exterior vault, we had seven 277-volt lines joined as follows (amps): 19 + 19 = 38 x 1.25 (multiplier to provide required excess circuit ampacity per code) = 47.5; 19 + 19 = 38 x 1.25 = 47.5; 14.4 + 14.4 + 14.4 = 43.2 x 1.25 = 54. We provided three circuits: 50, 50 and 60 amps 277-volt. The snow-melt sensor has three wires required for its separate conduit.

 

Expect the unexpected

While on vacation with my family, I received a panicked email from the owner of the construction firm. The electrical inspector had been on site to inspect the lower sidewalk installation of our electric snow-melt cables. Several of the corporate center’s executives overseeing the project were on hand to hear the inspector state, as fact, that our snow-melt system would never work! As you might expect, this threw everyone into a tizzy and I was out of town. I lost a day of vacation while dealing with the issue.

The first step was finding out why the electrical inspector would shoot off his mouth while throwing us under the bus. As it turned out, he had incorrectly assumed the bricks would be laid over a bed of sand, which would have seriously degraded this, or any other, snow-melt system’s performance. Hann and I were on the hot-seat and Hann really came through for us during this artificial crisis. Had the inspector bothered to ask the general contractor, who was on site, he could have easily ascertained the construction details and learned the bricks were to be bonded to the concrete with mortar and the bricks were to be 2–in. thick.

But the electrical inspector didn’t stop there. He said we should have installed a three-phase snow-melt system instead of a single-phase system; a three-phase system would not cost as much to operate.

Hann responded: “Watts does not offer three-phase components for our electric systems. Keep in mind with an electric system based upon watts per sq. ft., the energy consumption will be the same whether it be 120VAC, 208VAC, 240VAC or 277VAC. Your energy bills are based upon kilowatt hours, so the only advantage is that higher voltage systems require a lower amp load to deliver the same amount of energy.”

Those inspector loose lips darn near scuttled the project.

The opera ain’t over until the fat lady sings! Once a seed of doubt is placed in an owner’s head, you never really get off the hot seat. That statement by the electrical inspector was a poltergeist that wouldn’t be exorcised until everyone within the corporation witnessed the snow-melt system operation result in snow- and ice-free sidewalks and stairs. Mother Nature cooperated early in the season with several dustings of snow but no blizzard. The owner let me know in no uncertain terms that I was on the hook until the system could be tested by a more severe snow storm.

A heavy wet snow settled in on Jan. 20 and I recorded surface temperatures over the entire area. On average, our snow-melt areas were 65° F. Outdoor air temperature was 35° at 3:30 p.m. and the untreated sidewalk adjacent to our snow-melt was 32°. During the blizzard, no snow had been able to accumulate — we were officially off the hook!

Whether a hydronic or electric snow-melt system, you need to include time in your bid to be on site during the concrete pour to ensure no one does anything that has the potential to damage your snow-melt products. The general contractor on this project was a pleasure to work with. For the upper landing area, the company constructed bridges to span the area for workers to handle the pumped-in concrete and work the concrete floats. It’s also a good — no, make that great — idea to incorporate costs to have on hand extra product just as a CYA (cover your ass-sets) in the event your tubing or cable is damaged during the pour.

What electric snow-melt best practices can you share? Leave a comment below!

 


This article was originally titled “Providing safety and avoiding liability” in the 2015 Radiant & Hydronics Report.

Author bio: Dave Yates began his career in the PHVAC trades in 1972. He purchased F.W. Behler, a third-generation PHVAC firm, in 1985. The company has won numerous awards for its work and Yates was the first recipient of the international Carlson-Holohan Industry Award of Excellence. A published author in numerous trade publications, he has served as an adjunct professor and served on the Technical Advisory Board for the Thaddeus Stevens College of Technology. Yates is a past executive board member of the Radiant Professionals Alliance and a member of the Green Mechanical Council. 

KEYWORDS: electric radiant radiant heating snow melt

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

NIBCO Press Solutions

NIBCO Press Solutions

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

The interior of a government building.

President Trump signs executive order promoting skilled trades and apprenticeships

Figure 1 is a sketch of the flow problems of the current plumbing system.

Hydronic heating glitch solved: Why adding a circulator won't fix primary loop flow issue

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

PM BEMIS June 25 Free Webinar: Optimizing Plumbing Solutions for Single-Family, Multi-Family & Public Spaces

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Sidewalks above the snow-melt system are made of brick pavers.

    Holland Michigan's 35-year-old snow-melt system makes it a year-round destination

    See More
  • Showroom

    10 tips for successful contractor showrooms

    See More
  • slide

    9 tips for successful solar combisystem installations

    See More

Events

View AllSubmit An Event
  • June 13, 2016

    Advanced Radiant Design with Mark Eatherton

    This course drills deep into the engineering aspects of tube length, tube center density, tube size and other factors affecting hydronic radiant heating systems.
View AllSubmit An Event
×
Snow-melt system design requires an accurate assessment of the intended construction area, the geographic area, the physical property layout and runoff of melted snow and ice.  Photo credit: Dave Yates/F. W. Behler
The building owners wanted an electric snow-melt system rather than hydronic. The system uses Watts Radiant ProMelt cables.  Photo credit: Dave Yates/F. W. Behler
Shown are recorded surface temperatures once the electric snow-melt system was activated.  Photo credit: Dave Yates/F. W. Behler

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!