Figure 1 shows the piping layout for an actual installation. It uses two boilers, fired in stages, to supply three areas of a building. One of those areas is sub-divided into three zones. The other two areas are handled by individual zone circulators. The “primary circulator” operates whenever any load circuit is on. All circulators are fixed speed, and there is a partially closed ball valve at the end of the “primary loop.”