Highlights of the QSC Power Meeting XLII in Scottsdale included an extensive afternoon tour of the 30,000–sq.-ft. headquarters of George Brazil Plumbing.
When pressure-testing a Manabloc and PEX system with air, after rough-in, I shut off all valves on the Manabloc, leaving pressure in each individual line.