• Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
  • ENGINEERS
  • RADIANT & HYDRONICS
  • INSIGHTS
  • MEDIA
  • RESOURCES
  • EMAGAZINE
  • SIGN UP!
cart
facebook instagram twitter linkedin youtube
  • CONTRACTORS
  • BATH & KITCHEN PRO
  • BUSINESS MANAGEMENT
  • HIGH EFFICIENCY HOMES
  • TECHNOLOGY
  • WATER TREATMENT
  • PMC COLUMNS
  • PMC COLUMNS
  • Dave Yates: Contractor’s Corner
  • John Siegenthaler: Hydronics Workshop
  • Kenny Chapman: The Blue Collar Coach
  • Matt Michel: Service Plumbing Pros
  • Scott Secor: Heating Perceptions
  • ENGINEERS
  • CONTINUING EDUCATION
  • DECARBONIZATION | ELECTRIFICATION
  • FIRE PROTECTION
  • GEOTHERMAL | SOLAR THERMAL
  • PIPING | PLUMBING | PVF
  • PME COLUMNS
  • PME COLUMNS
  • Christoph Lohr: Strategic Plumbing Insights
  • David Dexter: Plumbing Talking Points
  • James Dipping: Engineer Viewpoints
  • John Seigenthaler: Renewable Heating Design
  • Lowell Manalo: Plumbing Essentials
  • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
  • RADIANT COMFORT REPORT
  • THE GLITCH & THE FIX
  • INSIGHTS
  • CODES
  • GREEN PLUMBING & MECHANICAL
  • PROJECT PROFILES
  • COLUMNS
  • SPONSOR INSIGHTS
  • COLUMNS
  • Codes Corner
  • Natalie Forster: Editorial Opinion
  • Guest Editorial
  • MEDIA
  • PODCASTS
  • VIDEOS
  • WEBINARS
  • RESOURCES
  • INDUSTRY CALENDAR
  • DIRECTORIES
  • EBOOKS
  • PM BOOKSTORE
  • CE CENTER
  • MARKET RESEARCH
  • CLASSIFIEDS
  • EMAGAZINE
  • EMAGAZINE
  • ARCHIVE ISSUES
  • CONTACT
  • ADVERTISE
  • PME EMAGAZINE ARCHIVES
search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!
Columns

A Bit Too Pushy

By John Siegenthaler, P.E.
July 9, 2007
Sometimes one less circulator makes sense.

Figure 1


If one circulator is good, two must be better, right? If boosting flow rates is a legitimate way of correcting underperforming radiant systems, just slap in another circulator and call it a day, right? If a standard “header-type” distribution system works OK, just think how good it will work with another “helper” pump.

Imagine a conscientious plumbing and heating contractor who has installed zoned baseboard systems for years, and has always had those systems perform as expected. Along comes a great opportunity for his company to install a system in an 10,000-square-foot custom home where the owner wants radiant heating in some areas, baseboard in others, plenty of hot water for the eight showers, and no snow on the steps or sidewalks.

Our man sees this as the break he’s been waiting for. A chance to jump into the high-end housing market with systems that have all kinds of bells and whistles.

Down at the supply house, he’s told this type of job needs primary/secondary piping. “You know - just throw in a primary pump and connect all the zone circuits to the loop using closely spaced tees,” he’s told. After one of the counter guys sketches out a primary/secondary system, it all seems to make sense. Besides, in the back of his mind he’s sure he heard or read something about the “magic” of closely spaced tees.

So he loads the truck full of piping, circulators and all the other hardware needed to install this system, stuffs the sketch of primary/secondary piping in his pocket, and heads to the jobsite. On the drive over, he’s even thinking that if the piping is all neatly installed, one of the trade magazines will publish a photo of his installation.

What he initially creates is shown in Figure 1, and it is indeed a pure series primary/secondary system.

When the system is turned on, flow in all the circuits seems to be fine. However, the heat output of the 3rd and 4th secondary circuits along the primary loop are well below expectations. A few temperature readings along the primary loop gets followed by a hard swallow. He realizes that he didn’t account for the temperature drop along the primary circuit in the downstream direction. The amount of heat being extracted by secondary circuits No. 1 and No. 2 doesn’t leave much left for No. 3 and No. 4.

Visions of the photo op quickly fade. He starts wondering if the advice he got at the supply store was any good, and thinks he now knows how to solve the problem on his own. So out come the tools, and a few hours later the system has morphed into the schematic shown in Figure 2.

This piping design is based on his previous familiarity with header-type piping. He remembers how this approach provided the same water temperature to a zone circuit, and reasons that it should work just as well, if not better, with one extra circulator (e.g., the “primary circulator”). He adds piping and a valve to the end of the headers to form a loop. He feels the valve is necessary to “balance” flow in the primary loop.

He’s now created a mixture of what he knew worked in the past with what the guys at the supply house told him was the latest and greatest piping technique for sophisticated hydronic systems.

I’ve seen this piping configuration more times than I’ve cared to. It usually comes from someone who’s just gone through a “conversion” to the enlightened use of primary/secondary systems, but who also clings to the familiarity of header-type piping. Sounds like a nice compromise, doesn’t it? Too bad the laws of physics don’t like compromises.

When the reworked system is turned on, and a single zone calls for heat, that zone promptly gets heat. Unfortunately, so do all the other zones with inactive circulators!



Figure 2

Take This Piping And Shove It!

To figure out what went wrong with this well-intentioned but hydraulically challenged system, we need to start with the inescapable truth that pressure always decreases in the downstream flow direction. Start at Point A on the schematic in Figure 3.

Let’s say the pressure at Point A is 15 psi. Assume the primary circulator is wired to operate when any of the zone circuits calls for heat. As flow moves along the upper piping, pressure is dropping. The pressure at Point B is lower than at Point A. How much lower? It depends on piping diameter, length and flow rate, but rest assured it can be calculated. For now let’s just estimate there is a 0.5 psi pressure drop from A to B.

Flow then passes through the partially closed valve connecting the two headers. The pressure drop along this segment of the path obviously depends on the setting of the valve. The more restrictive its setting, the greater the ∆P. In any case, the pressure at Point C is lower than at Point B. Let’s say the pressure drop across the valve with the “primary circulator” operating is 2 psi.

Finally, flow passes back across the lower piping. The pressure at Point D is again lower than at Point C. Again, let’s assume the pressure drop along the header from C to D is 0.5 psi.

This makes the total pressure drop from Point A to Point D 3 psi (0.5 psi + 0.5 psi + 2 psi). Thus, the pressure at Point D is 15 - 3 = 12 psi.

The 3 psi pressure differential from A to D is significantly higher than the forward-opening pressure differential of a typical spring-loaded check valve or flowcheck in a zone circuit (typically about 0.3 psi). The result: Flow develops in ALL zone circuits, leading to overheating in many of them when only a single zone really needs heat. Been there, seen it, and trust me, it’s very real.



Figure 3

Lose The Primary Pusher

The easiest way to prevent this situation and save money in the process is to just stick with a header-type system. Don’t morph it into a piping aberration by adding another “helper” circulator and calling it a primary circulator.

Besides eliminating the zone heat migration problem, this approach eliminates the installation cost and, more importantly, the operating cost of a primary loop circulator. The latter can easily exceed $1,000 over the life of the system, even in a small residential system equipped with an 80-100 watt primary loop circulator.

If the primary loop is legitimately in the system to serve other secondary loads, connect the header assembly to the primary loop with a pair of closely spaced tees as shown in Figure 4. This hydraulically isolates the header assembly from the primary loop as well as from any other circuits in the system.

Be generous when it comes to header sizing. Short, fat headers are good - long, skinny headers are bad. The shorter the header and the greater its diameter, the lower the pressure drop along its length. In an ideal case, there would be zero pressure drop along a header regardless of the flow through it. This would allow perfect hydraulic separation of all circuits attached to the header. Realistically we can’t get the pressure drop to zero, but we can make it very low, thus the term “low-loss header.”

My suggestion is to size headers for a maximum flow velocity of 2 feet per second under full design flow rate. This provides insignificant pressure drop and allows all the hydraulic separation effect needed. Any minute pressure differentials are easily contained by the forward-opening resistance of spring-check or flowcheck valves in the zone circuits.

Figure 4

Stick To Standards

If you want to install primary/secondary piping systems, learn exactly how they are supposed to be assembled and don’t “morph” your design by thinking back to header systems. Remember, if you don’t have closely spaced tees, you don’t have primary/secondary piping.

Likewise, if you are relying on a low-loss header for hydraulic separation, don’t throw an extra circulator into the mix under the misguided assumption that it acts as a “helper” for the zone circulators.

Keep in mind that primary/secondary piping always involves one more circulator than an equivalent system using a low-loss header. Both piping concepts work when properly configured, but one obviously spins the electrical meter a bit slower.

Circulators are designed to be “pushy,” but don’t let them shove hot water were you don’t want it.



Links

  • Radiant & Hydronics e-News
  • Contact Plumbing & Mechanical

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Siegenthaler

John Siegenthaler, P.E., is a consulting engineer and principal of Appropriate Designs in Holland Patent, New York. In partnership with HeatSpring, he has developed several online courses that provide in-depth, design-level training in modern hydronics systems, air-to-water heat pumps and biomass boiler systems. Additional information and resources for hydronic system design are available on Siegenthaler’s website,  www.hydronicpros.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Worker using the Milwaukee Tool SWITCH PACK drain cleaner

    Pipeline profits: Drain cleaning, pipe inspection create opportunities

    Drain cleaning and inspection services offer lucrative...
    Plumbing News
    By: Nicole Krawcke
  • Uponor employee, Arturo Moreno

    The reinvestment in American manufacturing and training

    Plumbing & Mechanical Chief Editor Nicole Krawcke and...
    Plumbing News
    By: Nicole Krawcke and Natalie Forster
  • March 2024 Women in Plumbing hero image of woman engineer overlayed by circle of hexagon shapes with numbers from 1 to 10

    Celebrating 10 Influential Women in the Plumbing Industry

    Celebrating Women's History Month and Women in...
    Plumbing News
    By: Nicole Krawcke
Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • eMagazine
  • Manage My Preferences

AI can boost efficiency and profitability for plumbing, HVAC contractors

AI can boost efficiency and profitability for plumbing, HVAC contractors

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

Bell & Gossett Illustrates Path to Net-zero at AHR Expo

IPEX celebrates grand opening of new Florida distribution center

IPEX celebrates grand opening of new Florida distribution center

NIBCO Press Solutions

NIBCO Press Solutions

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Plumbing & Mechanical audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Plumbing & Mechanical or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • J.J. Keller CMV vehicles on road
    Sponsored byJ. J. Keller & Associates, Inc.

    The dash cam game-changer for small business safety

Popular Stories

Underfloor heating installation with drain sewer hole in bathroom close up on water floor heating.

Using hydronics to leverage time-of-use electrical rates

Watts Nexa mobile image

Behind the Wall: Where smart plumbing gets smarter

Six tankless water heaters that feed the nutraceutical manufacturer’s operations.

How to deliver large volumes of hot water quickly and intermittently

PMCE Home-X April 29 Free Webinar: From Legacy to Leadership: Preparing Your Home Services Business for the Next Generation

Events

November 13, 2024

Future Proofing MEP: Navigating the 2026 High Efficiency Water Heating Standards

Join our deep dive into DOE’s new standards so you can future-proof your MEP practice.

EARN: 0.1 ASPE CEU; 1 AIA LU/HSW; 0.1 IACET CEU*; 1 PDH

View All Submit An Event

Poll

Will business be up or down in 2025?

Do you anticipate business in 2025 to be up or down in comparison to 2024?
View Results Poll Archive

Products

The Water Came To A Stop

The Water Came To A Stop

See More Products

Download the FREE Water Conservation, Quality & Safety eBook: Plumbing Trends Increasing Safe Water Availability

Related Articles

  • Is 2 Foot Too Far?
    John Siegenthaler

    See More
  • John Siegenthaler Hydrolics Workshop

    A unique air-to-water heat pump system from a business entrepreneur

    See More
  • Siegenthaler PM

    Piping a dual-heat system

    See More
×

Keep your content unclogged with our newsletters!

Stay in the know on the latest plumbing & piping industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Supply House Times
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

search
cart
facebook instagram twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • CONTRACTORS
    • BATH & KITCHEN PRO
    • BUSINESS MANAGEMENT
    • HIGH EFFICIENCY HOMES
    • TECHNOLOGY
    • WATER TREATMENT
    • PMC COLUMNS
      • Dave Yates: Contractor’s Corner
      • John Siegenthaler: Hydronics Workshop
      • Kenny Chapman: The Blue Collar Coach
      • Matt Michel: Service Plumbing Pros
      • Scott Secor: Heating Perceptions
  • ENGINEERS
    • CONTINUING EDUCATION
    • DECARBONIZATION | ELECTRIFICATION
    • FIRE PROTECTION
    • GEOTHERMAL | SOLAR THERMAL
    • PIPING | PLUMBING | PVF
    • PME COLUMNS
      • Christoph Lohr: Strategic Plumbing Insights
      • David Dexter: Plumbing Talking Points
      • James Dipping: Engineer Viewpoints
      • John Seigenthaler: Renewable Heating Design
      • Lowell Manalo: Plumbing Essentials
      • Misty Guard: Guard on Compliance
  • RADIANT & HYDRONICS
    • RADIANT COMFORT REPORT
    • THE GLITCH & THE FIX
  • INSIGHTS
    • CODES
    • GREEN PLUMBING & MECHANICAL
    • PROJECT PROFILES
    • COLUMNS
      • Codes Corner
      • Natalie Forster: Editorial Opinion
      • Guest Editorial
    • SPONSOR INSIGHTS
  • MEDIA
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • RESOURCES
    • INDUSTRY CALENDAR
    • DIRECTORIES
    • EBOOKS
    • PM BOOKSTORE
    • CE CENTER
    • MARKET RESEARCH
    • CLASSIFIEDS
  • EMAGAZINE
    • EMAGAZINE
    • ARCHIVE ISSUES
    • CONTACT
    • ADVERTISE
    • PME EMAGAZINE ARCHIVES
  • SIGN UP!