An installer is asked to provide a system that supplies two zones of fin-tube baseboard and two zones of floor heating. The system also supplies domestic water heating. He selects a mod/con boiler because it’s lighter than a conventional boiler and pipes it as shown in the Glitch drawing above. The primary circulator runs when any of the space-heating zones call for heat.