Exercise: There are at least 10 design errors present in this schematic. Can you spot at least five of them?
2. Piping leading to DHW tank is sized to handle flow necessary to convey full output of all boilers to tank heat exchanger. A 3/4-inch tube will not convey several hundred thousand Btu/hr. with a nominal 20 degree F temperature drop across the tank heat exchanger.