Plumbing & Mechanical Magazine
 Home
 Subscribe
 e-Newsletter
 MicroSites
 Archives
 PM Digital Edition
 Latest News
 Green
 Vendors & Suppliers
 New Products
 Columns
 Blogs
 Videos
 Online
 Best Contractor To Work For
 Best Looking Truck Contest
 Calendar
 Events Photo Gallery
 Tool-Tips
 Buyer's Guide
 How To Corner
 Manufacturers' Rep Locator Directory
 Classifieds
 Career Search
 Webinars
 Resources
 Current Issue
 Ad Index
 Showrooms
 Water Info Library
 Market Research
 AEC Store
 PM Special Collections
 Radiant Flooring Guide Directory
 Solar Thermal Report
 Digital Radiant Flooring Guide
 Radiant Heating Report
 Industry Links
 Subscription Customer Service
 PM Info
 Contact Us
Search in: EditorialProductsCompanies
New Nibco Dura-PEX Facility

January 9, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



NIBCO will combine its PEX extrusion operation and post-processing/distribution operations into a new facility in Lebanon, Ohio. The 130,000-sq.-ft. facility has ample room for expansion of manufacturing and distribution operations, and will make NIBCO’s Dura-PEX manufacturing operations more efficient.

“The move was made in anticipation of NIBCO’s future growth in the PEX market,” announced Randy Doering, NIBCO general manager – PEX piping systems.

NIBCO Dura-PEX tubing had been previously manufactured at 2775 Henkle Drive in Lebanon, Ohio, which is directly across the street from the new facility. The tubing was then post-processed and shipped from the Franklin, Ohio, facility, which is located 15 miles from Lebanon.

As of Dec. 15, all Dura-PEX tubing has shipped from the new location. All Lebanon and Franklin associates will be relocating to the new Lebanon location and both facilities will be completely exited by the end of January 2009.

The new Dura-PEX address is 2800 Henkle Drive, Lebanon, Ohio 45036.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.





BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy